Sullivan Solar Power

How many solar installs has Sullivan Solar Power done in California, and which license number is on its installs?

Sullivan Solar Power has 8,257 residential solar installs interconnected in California, active in the records from 2005 through 2024 (Sep 7, 2005 to Sep 11, 2024), most of them in San Diego County (6,713), Orange County (934) and Riverside County (433). The license number recorded on most of its installs, 839077, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
8,257
Last 24 months
1
Total capacity
54,421.8 kW DC
Median system size
6.1 kW DC
With battery storage
0.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
5.6% of 5,887 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 58, lease 224, prepaid lease 2, other 44
Median battery size
9.8 kWh (2 installs list a capacity)
First install
Sep 7, 2005
Latest install
Sep 11, 2024
Counties
6
Utilities
SDGE 7,160, SCE 1,097
CSLB license
839077

Is Sullivan Solar Power still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (0 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200520
2006290
2007380
2008540
20091110
20101400
20111530
20124090
20136250
20148090
20151,4470
20161,1040
20178100
20187072
20191,0430
20204470
20213260
202220
202300
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 8,257 interconnected installs with a tariff recorded (8,257) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04,70657.0%not counted
NEM 2.03,55143.0%2 (28.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 328 of Sullivan Solar Power’s installs the utility recorded a third-party ownership type: PPA 58, lease 224, prepaid lease 2, other 44. Across all installers, 13 residential systems list a third-party owner name that matches Sullivan Solar Power exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Solar Program I, LLC75
SunPower72
Kilowatt Systems, LLC71
SunPower Capital, LLC50
NRG SunCap LLC13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Sullivan Solar Power’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Silfab.

In the last 24 months, 1 of Sullivan Solar Power’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, none of Sullivan Solar Power’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1not in top list
Inverter makerSolarEdge13,216
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,134 of 8,257 installs, inverters on 7,892. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sullivan Solar Power as developer on 927 battery storage projects and as installer on 871 (871 name it as both), 927 projects in all with 8,286 kWh of storage. 804 have the status Paid, with $2,219,518 in current incentive allocations. Applications were received from May 1, 2017 to Oct 5, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8046,926$2,219,518
Cancelled1201,320$372,949
RRF Rejected340$6,852

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage9168,082$2,547,010803$2,216,160
Large-Scale Storage8164$45,4571$3,358
Not stated340$6,8520$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
839077Not found in the CSLB License Master file pulled Nov 4, 20264,890

License numbers are the ones the utilities recorded on the interconnection applications (4,905 of 8,257 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Sullivan Solar Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021Total
unincorporated San Diego County8390771791565963457

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego6,713
Orange934
Riverside433
San Bernardino92
Los Angeles81
Ventura4

Top cities

CityInstalls
San Diego2,761
Carlsbad364
Poway315
El Cajon307
Escondido303
Chula Vista274
La Mesa234
Encinitas228
La Jolla219
Fallbrook215
Oceanside141
Rancho Santa Fe135
Ramona132
San Marcos132
Coronado118

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sullivan Solar Power7,696
SULLIVAN SOLAR POWER561

Common questions

Where does Sullivan Solar Power install solar?

Its installs are spread across 6 counties. The most are in San Diego County (6,713 installs), followed by Orange County (934).

How often does Sullivan Solar Power install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sullivan Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 8,257 interconnected installs with a tariff recorded (8,257) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.