Sunlight Solar Inc

How many solar installs has Sunlight Solar Inc done in California, and which license number is on its installs?

Sunlight Solar Inc has 1,743 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jan 24, 2015 to Aug 24, 2026), most of them in San Diego County (1,207), Riverside County (289) and Orange County (104). CSLB lists license 997589 (SUNLIGHT SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, C-39, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,743
Last 24 months
113
Total capacity
10,005.6 kW DC
Median system size
5.1 kW DC
With battery storage
10.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.4% of 1,718 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
173 installs, latest Aug 24, 2026
Ownership types recorded
PPA 36, other 22
Median battery size
10 kWh (52 installs list a capacity)
First install
Jan 24, 2015
Latest install
Aug 24, 2026
Counties
13
Utilities
SDGE 1,253, SCE 478, PGE 12
CSLB license
997589

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
20151470
20161550
20171090
20181190
20192210
20201380
20211773
20222581
20232464
20248216
20255723
2026 (through Aug 31, 2026)345

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

173 of its 1,743 interconnected installs (9.9% of the 1,743 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.028816.5%not counted
NEM 2.01,28273.6%16 (4.5%)
Net Billing Tariff1739.9%36 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 58 of Sunlight Solar Inc’s installs the utility recorded a third-party ownership type: PPA 36, lease 0, prepaid lease 0, other 22. Across all installers, 37 residential systems list a third-party owner name that matches Sunlight Solar Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunlight Solar Inc36
LightReach17
SolSource DevCo LLC3
Karen Juneau1
Sunligth Solar Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 99 of Sunlight Solar Inc’s 113 installs name a module maker in the “Generator Manufacturer” fields, and most of those (84, 84.8%) used modules recorded as Qcells.

In the last 24 months, 113 of Sunlight Solar Inc’s 113 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (105, 92.9%) used inverters recorded as Enphase.

In the last 24 months, 32 of Sunlight Solar Inc’s 113 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 87.5%) used batteries recorded as Enphase.

50 of 52 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells84958
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.10not in top list
LONGi2not in top list
REC2not in top list
Canadian Solar1not in top list
Inverter makerEnphase1051,600
Tesla914
SolarEdge597
Battery makerEnphase2845
Tesla44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,607 of 1,743 installs, inverters on 1,743. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunlight Solar Inc as developer on 7 battery storage projects and as installer on 7 (7 name it as both), 7 projects in all with 90 kWh of storage. 4 have the status Paid, with $10,191 in current incentive allocations. Applications were received from Oct 8, 2021 to Dec 24, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid458$10,191
Cancelled332$12,801

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage681$13,5994$10,191
Equity Resiliency19$9,3930$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997589SUNLIGHT SOLAR INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-17; C-39 Roofing Contractor; C-46 Solar ContractorOct 14, 2014Oct 31, 20281,571

License numbers are the ones the utilities recorded on the interconnection applications (1,572 of 1,743 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 997589. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sunlight Solar Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County997589244830334031495224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego1,207
Riverside289
Orange104
Los Angeles76
San Bernardino36
Ventura19
Alameda3
Solano3
Santa Clara2
Contra Costa1
Fresno1
San Mateo1
Santa Cruz1

Top cities

CityInstalls
San Diego405
El Cajon116
Chula Vista115
Escondido68
Oceanside66
Santee48
Moreno Valley43
San Marcos40
Spring Valley38
La Mesa36
Vista35
Lakeside34
Lemon Grove30
Murrieta29
Hemet25

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunlight Solar Inc1,328
SUNLIGHT SOLAR INC382
Sunlight Solar Inc.24
SUNLIGHT SOLAR INC.8
SUNLIGHT SOLAR1

Common questions

Where does Sunlight Solar Inc install solar?

Its installs are spread across 13 counties. The most are in San Diego County (1,207 installs), followed by Riverside County (289).

How often does Sunlight Solar Inc install batteries with solar?

10.6% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (33 of 33). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunlight Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

173 of its 1,743 interconnected installs (9.9% of the 1,743 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.