Baker Electric, Inc.

How many solar installs has Baker Electric, Inc. done in California, and which license number is on its installs?

Baker Electric, Inc. has 21,299 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Oct 27, 2006 to Aug 28, 2026), most of them in San Diego County (20,387), Orange County (904) and Riverside County (7). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
21,299
Last 24 months
1,669
Total capacity
152,858.2 kW DC
Median system size
6.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
6.7% of 19,255 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1,667 installs, latest Aug 28, 2026
Ownership types recorded
PPA 190, lease 738, prepaid lease 138, other 225
First install
Oct 27, 2006
Latest install
Aug 28, 2026
Counties
4
Utilities
SDGE 21,290, SCE 9
CSLB license
858088

Is Baker Electric still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (863 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200700
200870
2009290
2010740
20111100
20122130
20134280
20147850
20151,3020
20161,9370
20171,3240
20181,6360
20192,2360
20201,5030
20211,8340
20222,5920
20232,9690
20249340
20259810
2026 (through Aug 31, 2026)4040

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1,667 of its 21,299 interconnected installs (7.9% of the 21,234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04,21619.9%not counted
NEM 2.015,35172.3%not recorded
Net Billing Tariff1,6677.9%not recorded
Not recorded65

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1,291 of Baker Electric, Inc.’s installs the utility recorded a third-party ownership type: PPA 190, lease 738, prepaid lease 138, other 225. Across all installers, 127 residential systems list a third-party owner name that matches Baker Electric, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Baker Electric Solar676
Baker Home Energy347
Baker Electric126
SunPower54
SunRun24

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1,333 of Baker Electric, Inc.’s 1,669 installs name a module maker in the “Generator Manufacturer” fields, and most of those (728, 54.6%) used modules recorded as Qcells.

In the last 24 months, 1,604 of Baker Electric, Inc.’s 1,669 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (936, 58.4%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells7283,767
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.252not in top list
Canadian Solar214288
REC1051,831
SEGSolarInc.12not in top list
Inverter makerTesla9361,111
Enphase6288,571
SolarEdge857,154
SMA332,177
SunPower20not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 19,832 of 21,299 installs, inverters on 20,807. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Baker Electric, Inc. as developer on 0 battery storage projects and as installer on 12 (0 name it as both), 12 projects in all with 7,717 kWh of storage. 5 have the status Paid, with $1,378,278 in current incentive allocations. Applications were received from Oct 13, 2014 to Oct 30, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid51,590$1,378,278
PBI in Process31,502$409,277
Reserved44,625$1,039,461

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage86,244$1,479,5161$30,778
Small Residential Storage113$2,9001$2,900
Not stated31,460$1,344,6003$1,344,600

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
858088BAKER HOME ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar ContractorApr 28, 2005Apr 30, 202717,193

License numbers are the ones the utilities recorded on the interconnection applications (17,213 of 21,299 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Baker Electric, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County858088492605389404556556194209903,495

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego20,387
Orange904
Riverside7
Los Angeles1

Top cities

CityInstalls
San Diego6,560
Escondido2,324
Carlsbad1,304
San Marcos1,097
Poway1,045
El Cajon861
Oceanside800
Vista726
Ramona667
Encinitas648
Chula Vista637
Santee490
Fallbrook439
La Mesa418
Lakeside336

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Baker Electric, Inc.21,279
Baker Electric, Inc11
Baker Electric9

Common questions

Where does Baker Electric, Inc. install solar?

Its installs are spread across 4 counties. The most are in San Diego County (20,387 installs), followed by Orange County (904).

How often does Baker Electric, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Baker Electric, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

1,667 of its 21,299 interconnected installs (7.9% of the 21,234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.