Baker Electric, Inc.
How many solar installs has Baker Electric, Inc. done in California, and which license number is on its installs?
Baker Electric, Inc. has 21,299 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Oct 27, 2006 to Aug 28, 2026), most of them in San Diego County (20,387), Orange County (904) and Riverside County (7). CSLB lists license 858088 (BAKER HOME ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-39, C-46, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 21,299
- Last 24 months
- 1,669
- Total capacity
- 152,858.2 kW DC
- Median system size
- 6.5 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 6.7% of 19,255 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1,667 installs, latest Aug 28, 2026
- Ownership types recorded
- PPA 190, lease 738, prepaid lease 138, other 225
- First install
- Oct 27, 2006
- Latest install
- Aug 28, 2026
- Counties
- 4
- Utilities
- SDGE 21,290, SCE 9
- CSLB license
- 858088
Is Baker Electric still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (863 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2006 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2006 | 1 | 0 |
| 2007 | 0 | 0 |
| 2008 | 7 | 0 |
| 2009 | 29 | 0 |
| 2010 | 74 | 0 |
| 2011 | 110 | 0 |
| 2012 | 213 | 0 |
| 2013 | 428 | 0 |
| 2014 | 785 | 0 |
| 2015 | 1,302 | 0 |
| 2016 | 1,937 | 0 |
| 2017 | 1,324 | 0 |
| 2018 | 1,636 | 0 |
| 2019 | 2,236 | 0 |
| 2020 | 1,503 | 0 |
| 2021 | 1,834 | 0 |
| 2022 | 2,592 | 0 |
| 2023 | 2,969 | 0 |
| 2024 | 934 | 0 |
| 2025 | 981 | 0 |
| 2026 (through Aug 31, 2026) | 404 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1,667 of its 21,299 interconnected installs (7.9% of the 21,234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 4,216 | 19.9% | not counted |
| NEM 2.0 | 15,351 | 72.3% | not recorded |
| Net Billing Tariff | 1,667 | 7.9% | not recorded |
| Not recorded | 65 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 1,291 of Baker Electric, Inc.’s installs the utility recorded a third-party ownership type: PPA 190, lease 738, prepaid lease 138, other 225. Across all installers, 127 residential systems list a third-party owner name that matches Baker Electric, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Baker Electric Solar | 676 |
| Baker Home Energy | 347 |
| Baker Electric | 126 |
| SunPower | 54 |
| SunRun | 24 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1,333 of Baker Electric, Inc.’s 1,669 installs name a module maker in the “Generator Manufacturer” fields, and most of those (728, 54.6%) used modules recorded as Qcells.
In the last 24 months, 1,604 of Baker Electric, Inc.’s 1,669 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (936, 58.4%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 728 | 3,767 |
| HDHYUNDAIENERGYSOLUTIONSCO.,LTD. | 252 | not in top list | |
| Canadian Solar | 214 | 288 | |
| REC | 105 | 1,831 | |
| SEGSolarInc. | 12 | not in top list | |
| Inverter maker | Tesla | 936 | 1,111 |
| Enphase | 628 | 8,571 | |
| SolarEdge | 85 | 7,154 | |
| SMA | 33 | 2,177 | |
| SunPower | 20 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 19,832 of 21,299 installs, inverters on 20,807. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Baker Electric, Inc. as developer on 0 battery storage projects and as installer on 12 (0 name it as both), 12 projects in all with 7,717 kWh of storage. 5 have the status Paid, with $1,378,278 in current incentive allocations. Applications were received from Oct 13, 2014 to Oct 30, 2024.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 5 | 1,590 | $1,378,278 |
| PBI in Process | 3 | 1,502 | $409,277 |
| Reserved | 4 | 4,625 | $1,039,461 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Large-Scale Storage | 8 | 6,244 | $1,479,516 | 1 | $30,778 |
| Small Residential Storage | 1 | 13 | $2,900 | 1 | $2,900 |
| Not stated | 3 | 1,460 | $1,344,600 | 3 | $1,344,600 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 858088 | BAKER HOME ENERGY (Corporation) | CLEAR | C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-39 Roofing Contractor; C-46 Solar Contractor | Apr 28, 2005 | Apr 30, 2027 | 17,193 |
License numbers are the ones the utilities recorded on the interconnection applications (17,213 of 21,299 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 858088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Baker Electric, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| unincorporated San Diego County | 858088 | 492 | 605 | 389 | 404 | 556 | 556 | 194 | 209 | 90 | 3,495 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Baker Electric Home Energy: 537 installs, license 858088
- Baker Electric Solar: 431 installs, license 858088
- NB BAKER ELECTRIC INC: 280 installs, license 858088
- N B BAKER ELECTRIC INC: 170 installs, license 858088
- BAKER HOME ENERGY: 142 installs, license 858088
Counties
| County | Installs |
|---|---|
| San Diego | 20,387 |
| Orange | 904 |
| Riverside | 7 |
| Los Angeles | 1 |
Top cities
| City | Installs |
|---|---|
| San Diego | 6,560 |
| Escondido | 2,324 |
| Carlsbad | 1,304 |
| San Marcos | 1,097 |
| Poway | 1,045 |
| El Cajon | 861 |
| Oceanside | 800 |
| Vista | 726 |
| Ramona | 667 |
| Encinitas | 648 |
| Chula Vista | 637 |
| Santee | 490 |
| Fallbrook | 439 |
| La Mesa | 418 |
| Lakeside | 336 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Baker Electric, Inc. | 21,279 |
| Baker Electric, Inc | 11 |
| Baker Electric | 9 |
Common questions
Where does Baker Electric, Inc. install solar?
Its installs are spread across 4 counties. The most are in San Diego County (20,387 installs), followed by Orange County (904).
How often does Baker Electric, Inc. install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Baker Electric, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
1,667 of its 21,299 interconnected installs (7.9% of the 21,234 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.