Solar Symphony Construction Inc.

How many solar installs has Solar Symphony Construction Inc. done in California, and which license number is on its installs?

Solar Symphony Construction Inc. has 566 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Nov 30, 2015 to Aug 31, 2026), most of them in Orange County (232), Los Angeles County (142) and Riverside County (96). CSLB lists license 988146 (SOLAR SYMPHONY CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
566
Last 24 months
97
Total capacity
5,026.8 kW DC
Median system size
8.1 kW DC
With battery storage
22.1% all time; 86.6% last 24 months
Third-party owned
1.2% of 566 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
101 installs, latest Aug 31, 2026
Ownership types recorded
PPA 2, lease 1, prepaid lease 1, other 3
Median battery size
13.5 kWh (125 installs list a capacity)
First install
Nov 30, 2015
Latest install
Aug 31, 2026
Counties
13
Utilities
SCE 540, PGE 26
CSLB license
988146

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201530
2016510
20171000
2018382
2019344
2020340
2021311
20229713
2023627
20243221
20255347
2026 (through Aug 31, 2026)3130

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

101 of its 566 interconnected installs (17.8% of the 566 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010819.1%not counted
NEM 2.035763.1%37 (10.4%)
Net Billing Tariff10117.8%88 (87.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 7 of Solar Symphony Construction Inc.’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 1, other 3. No residential system in the file lists a third-party owner name that matches Solar Symphony Construction Inc. exactly.

Third-party owner named on its installsInstalls
HDM Capital LLC4
Participate Holdings, LLC2
Participate Holdings, LCC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 97 of Solar Symphony Construction Inc.’s 97 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 21.6%) used modules recorded as Qcells.

In the last 24 months, 97 of Solar Symphony Construction Inc.’s 97 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (67, 69.1%) used inverters recorded as Tesla.

In the last 24 months, 84 of Solar Symphony Construction Inc.’s 97 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (74, 88.1%) used batteries recorded as Tesla.

119 of 125 battery-paired PG&E and SCE installs (95.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells21300
Aptos Solar2020
JA Solar16not in top list
Hyundai1345
REC6not in top list
Inverter makerTesla6778
Enphase25151
SolarEdge4304
APsystems (Altenergy Power System)15
SMA1not in top list
Battery makerTesla7479
Enphase824
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 551 of 566 installs, inverters on 566. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Solar Symphony Construction Inc. as developer on 160 battery storage projects and as installer on 158 (154 name it as both), 164 projects in all with 3,569 kWh of storage. 33 have the status Paid, with $705,825 in current incentive allocations. Applications were received from Feb 23, 2016 to Feb 20, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid33489$705,825
Reserved66871$1,654,246
Pending Reservation15211$416,085
Waitlist240$29,758
Cancelled431,895$1,320,125
RRF Rejected563$110,668

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209871,148$2,292,21420$543,563
Residential Solar and Storage Equity - AB 209 Non-POU43594$1,084,3101$26,541
Small Residential Storage12158$34,9736$18,859
Equity Resiliency8219$197,2016$116,861
Large-Scale Storage41,180$374,4550$0
Residential Solar and Storage Equity - Ratepayer113$14,5200$0
Not stated9256$239,0340$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988146SOLAR SYMPHONY CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorOct 31, 2013Oct 31, 2027565

License numbers are the ones the utilities recorded on the interconnection applications (566 of 566 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988146. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Solar Symphony Construction Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9881462031691021324106

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange232
Los Angeles142
Riverside96
San Bernardino45
Ventura20
Fresno10
Santa Cruz6
Tulare4
Kings3
San Luis Obispo3
Kern2
Santa Barbara2
Santa Clara1

Top cities

CityInstalls
Mission Viejo34
Huntington Beach26
Murrieta14
Santa Ana14
Newport Beach13
Temecula13
Corona11
Fullerton11
Irvine11
Claremont10
Costa Mesa10
Long Beach10
Thousand Oaks10
Orange9
Santa Monica9

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR SYMPHONY CONSTRUCTION INC439
Solar Symphony Construction Inc.107
Solar Symphony Construction, Inc7
Solar Symphony Construction6
Solar Symphony Construction, Inc.5
SOLAR SYMPHONY CONSTRUCTION1
Solar Symphony Construction Inc1

Common questions

Where does Solar Symphony Construction Inc. install solar?

Its installs are spread across 13 counties. The most are in Orange County (232 installs), followed by Los Angeles County (142).

How often does Solar Symphony Construction Inc. install batteries with solar?

22.1% of its interconnected solar installs include battery storage across all years, and 86.6% in the last 24 months (84 of 97).

How many Solar Symphony Construction Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

101 of its 566 interconnected installs (17.8% of the 566 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.