Cyberdyne construction

How many solar installs has Cyberdyne construction done in California, and which license number is on its installs?

Cyberdyne construction has 699 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jun 7, 2019 to Aug 28, 2026), most of them in San Diego County (355), Riverside County (147) and Los Angeles County (52). CSLB lists license 1050614 (CYBERDYNE CONSTRUCTION LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
699
Last 24 months
101
Total capacity
5,294.5 kW DC
Median system size
6.7 kW DC
With battery storage
7.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 71.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
10.9% of 697 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
119 installs, latest Aug 28, 2026
Ownership types recorded
PPA 76
Median battery size
13.5 kWh (27 installs list a capacity)
First install
Jun 7, 2019
Latest install
Aug 28, 2026
Counties
23
Utilities
SDGE 359, SCE 302, PGE 38
CSLB license
1050614

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201970
202070
2021110
2022900
20234074
202410110
2025214
2026 (through Aug 31, 2026)559

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

119 of its 699 interconnected installs (17.1% of the 697 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.057882.9%8 (2.5%)
Net Billing Tariff11917.1%19 (90.5%)
Not recorded2

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 76 of Cyberdyne construction’s installs the utility recorded a third-party ownership type: PPA 76, lease 0, prepaid lease 0, other 0. Across all installers, 29 residential systems list a third-party owner name that matches Cyberdyne construction exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun43
CYBERDYNE CONSTRUCTION LLC29
arlex cardoso2
Everbright1
Sunova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 92 of Cyberdyne construction’s 101 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (28, 30.4%) used modules recorded as SEGSolarInc..

In the last 24 months, 99 of Cyberdyne construction’s 101 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 60.6%) used inverters recorded as Tesla.

In the last 24 months, 14 of Cyberdyne construction’s 101 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 92.9%) used batteries recorded as Tesla.

25 of 27 battery-paired PG&E and SCE installs (92.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEGSolarInc.28not in top list
Mission Solar2137
Seraphim9not in top list
UnitedRenewableEnergyCo.,Ltd.9127
SEG Solar8not in top list
Inverter makerTesla6067
Enphase35470
SolarEdge3126
EG42not in top list
FOXESSCO.,LTD1not in top list
Battery makerTesla1313
Enphase16

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 660 of 699 installs, inverters on 697. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Cyberdyne construction as developer on 49 battery storage projects and as installer on 69 (49 name it as both), 69 projects in all with 2,089 kWh of storage. 6 have the status Paid, with $178,051 in current incentive allocations. Applications were received from Mar 25, 2020 to Nov 13, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6187$178,051
Reserved6152$154,681
Waitlist33965$1,256,311
Cancelled24786$839,388

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 20928702$948,4580$0
Equity Resiliency24841$898,4044$176,748
Residential Solar and Storage Equity - AB 209 Non-POU10383$481,4610$0
Small Residential Storage656$8,4542$1,303
Non-Residential Storage Equity1108$91,6540$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1050614CYBERDYNE CONSTRUCTION LLC (Limited Liability)CLEARB General Building ContractorFeb 25, 2019Feb 28, 2027697

License numbers are the ones the utilities recorded on the interconnection applications (697 of 699 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1050614. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Cyberdyne construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023202420252026Total
unincorporated San Diego County10506142131151831897

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego355
Riverside147
Los Angeles52
San Bernardino51
Orange46
Fresno10
Alameda6
Kern5
Tulare5
Contra Costa4
San Mateo3
Santa Clara3
Ventura2
Kings1
Marin1
Merced1
Monterey1
Placer1
San Joaquin1
San Luis Obispo1
Solano1
Sonoma1
Yolo1

Top cities

CityInstalls
San Diego127
Chula Vista46
Escondido34
Moreno Valley23
El Cajon22
Temecula19
Yucaipa17
Valley Center16
Murrieta14
Hemet13
San Marcos13
Spring Valley13
Vista12
Sun City11
National City10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Cyberdyne construction359
CYBERDYNE CONSTRUCTION LLC340

Common questions

Where does Cyberdyne construction install solar?

Its installs are spread across 23 counties. The most are in San Diego County (355 installs), followed by Riverside County (147).

How often does Cyberdyne construction install batteries with solar?

7.9% of its interconnected solar installs include battery storage across all years, and 71.4% in the last 24 months (15 of 21). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Cyberdyne construction installs are under NEM 3.0 (the Net Billing Tariff)?

119 of its 699 interconnected installs (17.1% of the 697 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.