VELASCO'S ELECTRICAL
How many solar installs has VELASCO'S ELECTRICAL done in California, and which license number is on its installs?
VELASCO'S ELECTRICAL has 273 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Dec 9, 2021 to Aug 28, 2026), most of them in Kern County (72), Tulare County (54) and San Joaquin County (23). CSLB lists license 1071951 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Dec 31, 2026.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 273
- Last 24 months
- 139
- Total capacity
- 2,186.4 kW DC
- Median system size
- 7.3 kW DC
- With battery storage
- 76.2% all time; 59.0% last 24 months
- Third-party owned
- 53.1% of 273 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 212 installs, latest Aug 28, 2026
- Ownership types recorded
- PPA 138, lease 4, other 3
- Median battery size
- 10 kWh (120 installs list a capacity)
- First install
- Dec 9, 2021
- Latest install
- Aug 28, 2026
- Counties
- 33
- Utilities
- PGE 151, SCE 122
- CSLB license
- 1071951
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2021 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2021 | 1 | 0 |
| 2022 | 0 | 0 |
| 2023 | 15 | 13 |
| 2024 | 137 | 131 |
| 2025 | 88 | 32 |
| 2026 (through Aug 31, 2026) | 32 | 32 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
212 of its 273 interconnected installs (77.7% of the 273 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 61 | 22.3% | 7 (11.5%) |
| Net Billing Tariff | 212 | 77.7% | 201 (94.8%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 145 of VELASCO'S ELECTRICAL’s installs the utility recorded a third-party ownership type: PPA 138, lease 4, prepaid lease 0, other 3. No residential system in the file lists a third-party owner name that matches VELASCO'S ELECTRICAL exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Solwerks | 131 |
| Solwerks Power | 11 |
| Good Leap | 1 |
| Light Reach / Palmetto Finance | 1 |
| Solweks | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 139 of VELASCO'S ELECTRICAL’s 139 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (52, 37.4%) used modules recorded as Mission Solar.
In the last 24 months, 139 of VELASCO'S ELECTRICAL’s 139 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (87, 62.6%) used inverters recorded as Enphase.
In the last 24 months, 76 of VELASCO'S ELECTRICAL’s 139 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (37, 48.7%) used batteries recorded as Tesla.
199 of 208 battery-paired PG&E and SCE installs (95.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mission Solar | 52 | 53 |
| Auxin Solar | 26 | 26 | |
| Znshine | 21 | 107 | |
| JinkoSolar | 20 | 20 | |
| Qcells | 13 | not in top list | |
| Inverter maker | Enphase | 87 | 215 |
| Tesla | 37 | 37 | |
| SolarEdge | 14 | 19 | |
| FranklinWH | 12 | 12 | |
| Sol-Ark | 7 | 7 | |
| Battery maker | Tesla | 37 | 37 |
| Enphase | 25 | 148 | |
| FranklinWH | 13 | 13 | |
| Storz Power Battery | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 269 of 273 installs, inverters on 273. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1071951 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor; C-39 Roofing Contractor | Dec 15, 2020 | Dec 31, 2026 | 273 |
License numbers are the ones the utilities recorded on the interconnection applications (273 of 273 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1071951. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list VELASCO'S ELECTRICAL’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | 2024 | Total |
|---|---|---|---|---|
| City and County of San Francisco | 1071951 | 0 | 1 | 1 |
| unincorporated San Diego County | 1071951 | 1 | 0 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
Top cities
| City | Installs |
|---|---|
| Mc Farland | 52 |
| Porterville | 32 |
| Delano | 15 |
| Stockton | 15 |
| Exeter | 8 |
| Vacaville | 7 |
| Fresno | 6 |
| San Bernardino | 6 |
| Moreno Valley | 4 |
| Springville | 4 |
| Acampo | 3 |
| Adelanto | 3 |
| Bakersfield | 3 |
| Dinuba | 3 |
| Ione | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| VELASCO'S ELECTRICAL | 270 |
| Velasco's Electrical | 3 |
Common questions
Where does VELASCO'S ELECTRICAL install solar?
Its installs are spread across 33 counties. The most are in Kern County (72 installs), followed by Tulare County (54).
How often does VELASCO'S ELECTRICAL install batteries with solar?
76.2% of its interconnected solar installs include battery storage across all years, and 59.0% in the last 24 months (82 of 139).
How many VELASCO'S ELECTRICAL installs are under NEM 3.0 (the Net Billing Tariff)?
212 of its 273 interconnected installs (77.7% of the 273 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.