Sunfinity Renewable Energy
How many solar installs has Sunfinity Renewable Energy done in California, and which license number is on its installs?
Sunfinity Renewable Energy has 139 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Dec 6, 2018 to Nov 23, 2020), most of them in San Bernardino County (19), Placer County (14) and Kern County (10). The license number recorded on most of its installs, 1013931, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 139
- Last 24 months
- 0
- Total capacity
- 961.3 kW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 1.4% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 8.6% of 139 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 10, lease 2
- Median battery size
- 9.8 kWh (2 installs list a capacity)
- First install
- Dec 6, 2018
- Latest install
- Nov 23, 2020
- Counties
- 28
- Utilities
- PGE 113, SCE 26
- CSLB license
- 1013931, 1057894
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 8 | 0 |
| 2019 | 113 | 0 |
| 2020 | 18 | 2 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 139 interconnected installs with a tariff recorded (139) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 139 | 100.0% | 2 (1.4%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 12 of Sunfinity Renewable Energy’s installs the utility recorded a third-party ownership type: PPA 10, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunfinity Renewable Energy exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sunnova | 10 |
| Loanpal | 1 |
| nnova | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 139 of Sunfinity Renewable Energy’s 139 installs name a module maker in the “Generator Manufacturer” fields, and most of those (102, 73.4%) used modules recorded as Qcells.
Across all years, 139 of Sunfinity Renewable Energy’s 139 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (126, 90.6%) used inverters recorded as Enphase.
Across all years, 2 of Sunfinity Renewable Energy’s 139 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.
2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 0 | 102 |
| JinkoSolar | 0 | 17 | |
| Trina Solar | 0 | 9 | |
| Solaria | 0 | 7 | |
| Panasonic | 0 | 2 | |
| Inverter maker | Enphase | 0 | 126 |
| SMA | 0 | 7 | |
| SolarEdge | 0 | 6 | |
| Battery maker | LG | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 139 of 139 installs, inverters on 139. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1013931 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 111 | ||||
| 1057894 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 24 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (138 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list Sunfinity Renewable Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | 2020 | Total |
|---|---|---|---|---|---|
| City and County of San Francisco | 1013931 | 0 | 17 | 1 | 18 |
| unincorporated Marin County | 1013931 | 1 | 0 | 0 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Sunfinity Solar - CA LLC: 304 installs, license 1013931
- Sunfinity Solar: 251 installs, license 1013931
- SUNFINITY SOLAR ELECTRIC: 52 installs, license 1057894
Counties
Top cities
| City | Installs |
|---|---|
| Bakersfield | 8 |
| Lincoln | 6 |
| San Bernardino | 5 |
| Vallejo | 5 |
| Woodland | 5 |
| Antioch | 4 |
| El Dorado Hills | 4 |
| Oroville | 4 |
| Rialto | 4 |
| Rocklin | 4 |
| Fontana | 3 |
| Grass Valley | 3 |
| Gustine | 3 |
| Martinez | 3 |
| Moreno Valley | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Sunfinity Renewable Energy | 115 |
| SUNFINITY RENEWABLE ENERGY LLC | 24 |
Common questions
Where does Sunfinity Renewable Energy install solar?
Its installs are spread across 28 counties. The most are in San Bernardino County (19 installs), followed by Placer County (14).
How often does Sunfinity Renewable Energy install batteries with solar?
1.4% of its interconnected solar installs include battery storage across all years.
How many Sunfinity Renewable Energy installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 139 interconnected installs with a tariff recorded (139) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.