INTEGRATESUN I LLC

How many solar installs has INTEGRATESUN I LLC done in California, and which license number is on its installs?

INTEGRATESUN I LLC has 111 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 24, 2024 to Aug 21, 2026), most of them in Los Angeles County (17), Alameda County (12) and Santa Clara County (11). CSLB lists license 1120224 (INTEGRATESUN I LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
111
Last 24 months
111
Total capacity
1,010.9 kW DC
Median system size
8.8 kW DC
With battery storage
90.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 111 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
109 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (92 installs list a capacity)
First install
Oct 24, 2024
Latest install
Aug 21, 2026
Counties
33
Utilities
PGE 69, SCE 41, SDGE 1
CSLB license
1120224

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202443
20256557
2026 (through Aug 31, 2026)4239

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

109 of its 111 interconnected installs (98.2% of the 111 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.021.8%2 (100.0%)
Net Billing Tariff10998.2%97 (89.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on INTEGRATESUN I LLC’s installs. No residential system in the file lists a third-party owner name that matches INTEGRATESUN I LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 106 of INTEGRATESUN I LLC’s 111 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (46, 43.4%) used modules recorded as Hyperion Solar.

In the last 24 months, 111 of INTEGRATESUN I LLC’s 111 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (87, 78.4%) used inverters recorded as Tesla.

In the last 24 months, 86 of INTEGRATESUN I LLC’s 111 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (81, 94.2%) used batteries recorded as Tesla.

85 of 99 battery-paired PG&E and SCE installs (85.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyperion Solar4646
REC2828
Canadian Solar1919
EG499
SEG Solar99
Inverter makerTesla8787
EG41212
Enphase1212
APsystems (Altenergy Power System)33
SMA33
Battery makerTesla8181
EG433
Enphase11
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 106 of 111 installs, inverters on 111. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1120224INTEGRATESUN I LLC (Limited Liability)CLEAR, Pending IFSC-46 Solar ContractorMay 2, 2024May 31, 2028111

License numbers are the ones the utilities recorded on the interconnection applications (111 of 111 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The License Master file lists a pending suspension date of Dec 7, 2026 for license 1120224. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list INTEGRATESUN I LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
City and County of San Francisco1120224134

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles17
Alameda12
Santa Clara11
Contra Costa6
Riverside6
San Bernardino5
Kern4
San Mateo4
Ventura4
Fresno3
Monterey3
Orange3
Placer3
San Francisco3
Tulare3
Amador2
Inyo2
Madera2
Merced2
Sonoma2
Tehama2
Lake1
Marin1
Mariposa1
Napa1
San Diego1
San Luis Obispo1
Santa Barbara1
Santa Cruz1
Shasta1
Solano1
Sutter1
Yolo1

Top cities

CityInstalls
San Jose7
Belmont3
Fremont3
Oakland3
San Francisco3
Arcadia2
Bakersfield2
Bishop2
Diamond Bar2
Hayward2
Livermore2
Los Banos2
Los Gatos2
Simi Valley2
Temple City2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INTEGRATESUN I LLC111

Common questions

Where does INTEGRATESUN I LLC install solar?

Its installs are spread across 33 counties. The most are in Los Angeles County (17 installs), followed by Alameda County (12).

How often does INTEGRATESUN I LLC install batteries with solar?

90.0% of its interconnected solar installs include battery storage across all years, and 90.0% in the last 24 months (99 of 110). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many INTEGRATESUN I LLC installs are under NEM 3.0 (the Net Billing Tariff)?

109 of its 111 interconnected installs (98.2% of the 111 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.8% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.