Solar installers in Los Banos, California
Most installs here are in Merced County.
Who installs the most solar in Los Banos?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Los Banos are Citadel Roofing and Solar (263), Sunrun (220) and GAF Energy (49). They account for 532 of the 797 residential solar installs interconnected there in that window.
In all, 5,235 homes in Los Banos have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 63 installers with installs in this window. 18 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 929 | 929 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 671 | 671 |
| 3 | Vivint Solar Developer, LLC | 543 | 543 |
| 4 | American Array Solar | 365 | 365 |
| 5 | Citadel Roofing and Solar | 335 | 335 |
| 6 | FREEDOM FOREVER LLC | 114 | 114 |
| 7 | SOLGEN ELECTRIC | 109 | 109 |
| 8 | Empower Electric Solar | 106 | 106 |
| 9 | SunPower | 103 | 103 |
| 10 | Quality Home Services | 86 | 86 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 752 | 24 |
| 2023 | 658 | 79 |
| 2024 | 462 | 327 |
| 2025 | 357 | 265 |
| 2026 (through Aug 31, 2026) | 253 | 162 |
Under the Net Billing Tariff (NEM 3.0)
758 of the 5,235 residential solar installs in Los Banos (14.5% of the 5,235 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Los Banos
| 1 | Sunrun | 265 | 265 | 100.0% |
| 2 | Citadel Roofing and Solar | 84 | 52 | 61.9% |
| 3 | Empower Electric Solar | 59 | 54 | 91.5% |
| 4 | Leonard's Roofing, Inc. | 38 | 0 | 0.0% |
| 5 | BRIGHT OPS | 30 | 29 | 96.7% |
| 6 | Bright Planet Solar | 30 | 0 | 0.0% |
| 7 | FREEDOM FOREVER LLC | 27 | 26 | 96.3% |
| 8 | BETTER EARTH ELECTRIC INC | 17 | 16 | 94.1% |
| 9 | GAF Energy | 17 | 17 | 100.0% |
| 10 | Quality Home Services | 17 | 17 | 100.0% |
| 11 | Tesla Energy Operations (formerly SolarCity) | 14 | 13 | 92.9% |
| 12 | GLOBAL ENERGY LLC | 8 | 7 | 87.5% |
| 13 | SOLAR NEGOTIATORS | 8 | 8 | 100.0% |
| 14 | POWER UP SOLUTIONS LLC | 7 | 7 | 100.0% |
| 15 | American Array Solar | 6 | 6 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 752 of Los Banos’ 797 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (235, 31.3%) used modules recorded as JA Solar.
In the last 24 months, 797 of Los Banos’ 797 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (479, 60.1%) used inverters recorded as Tesla.
In the last 24 months, 459 of Los Banos’ 797 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (321, 69.9%) used batteries recorded as Tesla.
755 of 894 battery-paired PG&E and SCE installs (84.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 235 | 493 |
| Qcells | 190 | 836 | |
| LONGi | 114 | 524 | |
| Canadian Solar | 111 | 466 | |
| Elin Energy | 42 | not in top list | |
| Inverter maker | Tesla | 479 | 591 |
| Enphase | 233 | 1,898 | |
| SolarEdge | 149 | 1,853 | |
| Lunar Energy | 17 | not in top list | |
| Delta Electronics | 12 | 173 | |
| Battery maker | Tesla | 321 | 395 |
| Enphase | 61 | 105 | |
| SolarEdge | 43 | 69 | |
| Lunar Energy | 17 | 17 | |
| LG | 8 | 142 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,784 of 5,235 installs, inverters on 5,235. See the methodology and the equipment index.
ZIP codes in Los Banos
ZIP codes with their own page where the utilities recorded Los Banos on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 93635 | 5,230 | 5,231 | 797 |
SGIP battery storage projects in Los Banos
The SGIP report lists 48 battery storage projects with the city Los Banos, 24 with the status Paid ($156,794 in current incentive allocations, 284 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 24 | 284 | $156,794 |
| PBI in Process | 1 | 446 | $151,550 |
| Reserved | 7 | 104 | $183,884 |
| Pending Reservation | 1 | 15 | $31,780 |
| Cancelled | 13 | 226 | $186,324 |
| RRF Rejected | 2 | 23 | $3,334 |
Installers named on the most SGIP storage projects in Los Banos
7 of the 48 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 5,235
- Last 24 months
- 797
- Capacity
- 32.9 MW DC
- Median system size
- 5.5 kW DC
- With battery storage
- 17.1% all time; 70.4% last 24 months
- Third-party owned
- 32.4% where reported
- Ownership types recorded
- PPA 1,344, lease 328, prepaid lease 9, other 15
- Median battery size
- 9.8 kWh
- Earliest install in data
- May 9, 2006
Common questions
How many homes in Los Banos have solar?
5,235 residential solar systems in Los Banos were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 797 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Los Banos?
63 installer names have at least one install interconnected in Los Banos in the last 24 months, and 289 appear in the full record.
How common are batteries with new solar in Los Banos?
17.1% of the solar installs interconnected in Los Banos include battery storage across all years, and 70.4% in the last 24 months (561 of 797).
How many solar installs in Los Banos are under NEM 3.0?
758 of the 5,235 residential solar installs in Los Banos (14.5% of the 5,235 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.