Epic Home Solar
How many solar installs has Epic Home Solar done in California, and which license number is on its installs?
Epic Home Solar has 188 residential solar installs interconnected in California, active in the records from 2015 through 2019 (Oct 1, 2015 to Jul 31, 2019), most of them in San Joaquin County (42), Solano County (36) and Yolo County (26). The license number recorded on most of its installs, 1006602, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 188
- Last 24 months
- 0
- Total capacity
- 1,141.8 kW DC
- Median system size
- 5.6 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 14.4% of 188 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 23, lease 1, prepaid lease 3
- First install
- Oct 1, 2015
- Latest install
- Jul 31, 2019
- Counties
- 23
- Utilities
- PGE 182, SCE 6
- CSLB license
- 1006602
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2015 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2015 | 13 | 0 |
| 2016 | 54 | 0 |
| 2017 | 42 | 0 |
| 2018 | 70 | 0 |
| 2019 | 9 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 188 interconnected installs with a tariff recorded (188) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 73 | 38.8% | not counted |
| NEM 2.0 | 115 | 61.2% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 27 of Epic Home Solar’s installs the utility recorded a third-party ownership type: PPA 23, lease 1, prepaid lease 3, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Epic Home Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sun Edison | 20 |
| HDM Capital | 3 |
| SunEdison | 2 |
| Epic Home Solar | 1 |
| Lifestyle Energy | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 186 of Epic Home Solar’s 188 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (44, 23.7%) used modules recorded as REC.
Across all years, 188 of Epic Home Solar’s 188 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (184, 97.9%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 0 | 44 |
| Qcells | 0 | 43 | |
| SunEdison | 0 | 40 | |
| LONGi | 0 | 23 | |
| Hyundai | 0 | 14 | |
| Inverter maker | SolarEdge | 0 | 184 |
| Enphase | 0 | 3 | |
| SMA | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 186 of 188 installs, inverters on 188. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1006602 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 183 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (188 of 188 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list Epic Home Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2022 | Total |
|---|---|---|---|
| City and County of San Francisco | 1006602 | 2 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Epic Energy: 394 installs, license 1006602
Counties
Top cities
| City | Installs |
|---|---|
| Stockton | 22 |
| Manteca | 15 |
| Dixon | 14 |
| Vacaville | 10 |
| Woodland | 10 |
| Davis | 8 |
| Fresno | 8 |
| Los Banos | 8 |
| Sonora | 8 |
| West Sacramento | 8 |
| Marysville | 6 |
| Yuba City | 5 |
| Rio Vista | 4 |
| Tracy | 4 |
| Vallejo | 4 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Epic Home Solar | 181 |
| EPIC HOME SOLAR | 4 |
| Epic Home SOlar | 3 |
Common questions
Where does Epic Home Solar install solar?
Its installs are spread across 23 counties. The most are in San Joaquin County (42 installs), followed by Solano County (36).
How often does Epic Home Solar install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Epic Home Solar installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 188 interconnected installs with a tariff recorded (188) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.