Epic Energy

How many solar installs has Epic Energy done in California, and which license number is on its installs?

Epic Energy has 394 residential solar installs interconnected in California, active in the records from 2018 through 2024 (Aug 22, 2018 to Sep 17, 2024), most of them in Fresno County (103), Tuolumne County (52) and San Joaquin County (50). The license number recorded on most of its installs, 1006602, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
394
Last 24 months
1
Total capacity
2,474.2 kW DC
Median system size
5.9 kW DC
With battery storage
2.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
9.4% of 394 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Nov 29, 2023
Ownership types recorded
PPA 29, lease 4, prepaid lease 4
First install
Aug 22, 2018
Latest install
Sep 17, 2024
Counties
31
Utilities
PGE 391, SDGE 2, SCE 1
CSLB license
1006602

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
20191060
2020660
202111310
2022671
2023400
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 394 interconnected installs (1.3% of the 394 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Nov 29, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.3%not counted
NEM 2.038898.5%11 (2.8%)
Net Billing Tariff51.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 37 of Epic Energy’s installs the utility recorded a third-party ownership type: PPA 29, lease 4, prepaid lease 4, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Epic Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova13
Everbright8
HDM Capital8
Lifestyle Energy3
Epic Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Epic Energy’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as CertainTeed.

In the last 24 months, 1 of Epic Energy’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Epic Energy’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

11 of 11 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed1not in top list
Inverter makerEnphase181
Battery makerGenerac011

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 379 of 394 installs, inverters on 394. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1006602Not found in the CSLB License Master file pulled Nov 4, 2026392

License numbers are the ones the utilities recorded on the interconnection applications (394 of 394 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Epic Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
City and County of San Francisco100660222

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno103
Tuolumne52
San Joaquin50
Contra Costa41
Calaveras24
Solano23
Yolo16
Alameda9
Yuba9
Santa Clara8
Stanislaus8
San Mateo7
Placer6
Amador5
Sutter4
Butte3
El Dorado3
Merced3
San Francisco3
Kern2
Monterey2
San Diego2
Shasta2
Tulare2
Kings1
Lake1
Madera1
Marin1
Napa1
Sonoma1
Tehama1

Top cities

CityInstalls
Fresno81
Sonora34
Stockton30
Clovis15
Antioch13
Vacaville10
Manteca9
Vallejo9
West Sacramento9
Jamestown8
Murphys8
San Jose7
Woodland7
Sanger6
Tracy6

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EPIC ENERGY306
Epic Energy87
Epic Energy dba Epic Home Solar1

Common questions

Where does Epic Energy install solar?

Its installs are spread across 31 counties. The most are in Fresno County (103 installs), followed by Tuolumne County (52).

How often does Epic Energy install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Epic Energy installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 394 interconnected installs (1.3% of the 394 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.