Plug It In Solar

How many solar installs has Plug It In Solar done in California, and which license number is on its installs?

Plug It In Solar has 295 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Mar 11, 2016 to Aug 21, 2026), most of them in Los Angeles County (173), Ventura County (80) and Orange County (17). CSLB lists license 1089848 (PLUG IT IN SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Plug It In Solar here carry more than one CSLB license number: 1089848 on 148 (CSLB holder PLUG IT IN SOLAR INC, Van Nuys) and 986882 on 145 (CSLB holder PLUG IT IN SOLAR, Van Nuys), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
295
Last 24 months
173
Total capacity
2,427.6 kW DC
Median system size
7.8 kW DC
With battery storage
78.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.3% of 295 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
131 installs, latest Aug 21, 2026
Ownership types recorded
prepaid lease 1
Median battery size
27 kWh (228 installs list a capacity)
First install
Mar 11, 2016
Latest install
Aug 21, 2026
Counties
7
Utilities
SCE 289, SDGE 6
CSLB license
1089848, 986882

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201640
2017100
2018264
2019155
202031
202120
202200
20232120
20245757
20257363
2026 (through Aug 31, 2026)8478

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

131 of its 295 interconnected installs (44.4% of the 295 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0124.1%not counted
NEM 2.015251.5%111 (76.0%)
Net Billing Tariff13144.4%115 (87.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Plug It In Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Plug It In Solar exactly.

Third-party owner named on its installsInstalls
Participate Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 171 of Plug It In Solar’s 173 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (83, 48.5%) used modules recorded as SunPower.

In the last 24 months, 173 of Plug It In Solar’s 173 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (118, 68.2%) used inverters recorded as Enphase.

In the last 24 months, 157 of Plug It In Solar’s 173 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (118, 75.2%) used batteries recorded as Tesla.

227 of 228 battery-paired PG&E and SCE installs (99.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower83102
Hyundai3639
Qcells1723
Panasonic756
REC5not in top list
Inverter makerEnphase118167
SunPower2740
SolarEdge2064
Fronius4not in top list
Power-One4not in top list
Battery makerTesla118181
FranklinWH3636
Enphase1not in top list
SolarEdge1not in top list
SunPower15

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 291 of 295 installs, inverters on 295. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Plug It In Solar as developer on 821 battery storage projects and as installer on 207 (165 name it as both), 863 projects in all with 23,848 kWh of storage. 504 have the status Paid, with $11,557,993 in current incentive allocations. Applications were received from Mar 18, 2015 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid50413,958$11,557,993
Reserved15380$296,868
Waitlist226$66,824
Cancelled3389,443$9,112,570
RRF Rejected441$7,504

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency68219,843$19,834,134357$10,707,551
Small Residential Storage1322,467$567,037118$519,740
Large-Scale Storage341,238$346,03526$250,804
Residential Solar and Storage Equity - Ratepayer5128$121,7692$62,379
Residential Solar and Storage Equity - AB 209 Non-POU483$122,2590$0
Residential Storage Equity130$25,5000$0
Not stated561$25,0241$17,520

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1089848PLUG IT IN SOLAR INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 11, 2022Apr 30, 2028148
986882PLUG IT IN SOLAR (Corporation)CLEARC-10 Electrical ContractorSep 16, 2013Sep 30, 2027145

License numbers are the ones the utilities recorded on the interconnection applications (295 of 295 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1089848, 986882. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles173
Ventura80
Orange17
San Bernardino12
San Diego5
Kern4
Riverside4

Top cities

CityInstalls
Simi Valley36
Santa Clarita15
Newbury Park14
Malibu10
Calabasas9
Long Beach9
Valencia9
Thousand Oaks8
Santa Monica7
Altadena6
Ventura6
Acton5
Agoura Hills5
El Segundo5
Moorpark5

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PLUG IT IN SOLAR INC125
PLUG IT IN SOLAR108
Plug It In Solar52
Plug it in Solar6
PLUG-IT-IN-SOLAR4

Common questions

Where does Plug It In Solar install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (173 installs), followed by Ventura County (80).

How often does Plug It In Solar install batteries with solar?

78.9% of its interconnected solar installs include battery storage across all years, and 90.8% in the last 24 months (157 of 173). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Plug It In Solar installs are under NEM 3.0 (the Net Billing Tariff)?

131 of its 295 interconnected installs (44.4% of the 295 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.