ELBAC SOLAR

How many solar installs has ELBAC SOLAR done in California, and which license number is on its installs?

ELBAC SOLAR has 524 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Feb 19, 2019 to Aug 31, 2026), most of them in San Bernardino County (229), Riverside County (194) and Los Angeles County (48). CSLB lists license 1072844 (ELBAC SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
524
Last 24 months
156
Total capacity
4,381.4 kW DC
Median system size
7.8 kW DC
With battery storage
39.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 91.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
17.8% of 523 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
219 installs, latest Aug 31, 2026
Ownership types recorded
PPA 87, lease 4, other 2
Median battery size
10 kWh (196 installs list a capacity)
First install
Feb 19, 2019
Latest install
Aug 31, 2026
Counties
9
Utilities
SCE 496, SDGE 27, PGE 1
CSLB license
1072844

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202030
2021180
20221412
20231419
20247257
202510592
2026 (through Aug 31, 2026)4336

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

219 of its 524 interconnected installs (41.9% of the 523 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.030458.1%5 (1.8%)
Net Billing Tariff21941.9%191 (90.1%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 93 of ELBAC SOLAR’s installs the utility recorded a third-party ownership type: PPA 87, lease 4, prepaid lease 0, other 2. Across all installers, 8 residential systems list a third-party owner name that matches ELBAC SOLAR exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Goodleap24
Solkraft16
Solwerks13
Elbac Solar7
Solwerks Power6

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 152 of ELBAC SOLAR’s 156 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (47, 30.9%) used modules recorded as JinkoSolar.

In the last 24 months, 155 of ELBAC SOLAR’s 156 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (126, 81.3%) used inverters recorded as Enphase.

In the last 24 months, 119 of ELBAC SOLAR’s 156 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (102, 85.7%) used batteries recorded as Enphase.

178 of 196 battery-paired PG&E and SCE installs (90.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar4750
Qcells2328
Hyundai20not in top list
Silfab20not in top list
Znshine20204
Inverter makerEnphase126333
EG41516
SolarEdge15119
Tesla1222
Power-One1not in top list
Battery makerEnphase102160
Tesla1212
FranklinWH44
Stackrack Battery11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 500 of 524 installs, inverters on 523. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ELBAC SOLAR as developer on 0 battery storage projects and as installer on 7 (0 name it as both), 7 projects in all with 359 kWh of storage. 1 have the status Paid, with $49,642 in current incentive allocations. Applications were received from May 22, 2024 to Jul 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid159$49,642
Reserved5240$209,868
Cancelled159$42,195

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency4225$189,6391$49,642
Residential Storage Equity2119$82,1950$0
Residential Solar and Storage Equity - AB 209 Non-POU115$29,8700$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1072844ELBAC SOLAR (Corporation)CLEARC-46 Solar ContractorJan 20, 2021Jan 31, 2027513

License numbers are the ones the utilities recorded on the interconnection applications (523 of 524 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1072844. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ELBAC SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222026Total
unincorporated San Diego County1072844123

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino229
Riverside194
Los Angeles48
San Diego25
Orange24
Kings1
San Joaquin1
Tulare1
Ventura1

Top cities

CityInstalls
San Bernardino68
Moreno Valley41
Victorville24
Fontana23
Rialto20
Murrieta18
Perris18
Hemet17
Riverside17
Lake Elsinore15
Corona14
Apple Valley10
Ontario9
Redlands9
San Jacinto9

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ELBAC SOLAR497
Elbac Solar27

Common questions

Where does ELBAC SOLAR install solar?

Its installs are spread across 9 counties. The most are in San Bernardino County (229 installs), followed by Riverside County (194).

How often does ELBAC SOLAR install batteries with solar?

39.4% of its interconnected solar installs include battery storage across all years, and 91.3% in the last 24 months (136 of 149). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ELBAC SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

219 of its 524 interconnected installs (41.9% of the 523 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.