Solar installers in Covina, California
Most installs here are in Los Angeles County.
Who installs the most solar in Covina?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Covina are Sunrun (123), SunPower (94) and V3 Electric (42). They account for 259 of the 621 residential solar installs interconnected there in that window.
In all, 3,828 homes in Covina have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 104 installers with installs in this window. 16 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunPower | 469 | 469 |
| 2 | Sunrun | 389 | 389 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 263 | 263 |
| 4 | Vivint Solar Developer, LLC | 106 | 106 |
| 5 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 104 | 104 |
| 6 | FREEDOM FOREVER LLC | 100 | 100 |
| 7 | Verengo | 90 | 90 |
| 8 | Bright Planet Solar | 74 | 74 |
| 9 | SUNERGY CONSTRUCTION INC | 64 | 64 |
| 10 | CalState Solar | 62 | 62 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 379 | 27 |
| 2023 | 587 | 75 |
| 2024 | 471 | 176 |
| 2025 | 282 | 213 |
| 2026 (through Aug 31, 2026) | 203 | 120 |
Under the Net Billing Tariff (NEM 3.0)
880 of the 3,828 residential solar installs in Covina (23.0% of the 3,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 57.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Covina
| 1 | SunPower | 192 | 7 | 3.6% |
| 2 | Sunrun | 161 | 120 | 74.5% |
| 3 | FREEDOM FOREVER LLC | 42 | 41 | 97.6% |
| 4 | V3 Electric | 42 | 42 | 100.0% |
| 5 | BRIGHT OPS | 37 | 28 | 75.7% |
| 6 | SUN BEES GROUPS INC DBA TRUE POWER SOLAR | 28 | 0 | 0.0% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 24 | 22 | 91.7% |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 23 | 22 | 95.7% |
| 9 | MARS BUILDER SOLUTIONS | 16 | 0 | 0.0% |
| 10 | SOUTH WEST BUILDERS | 15 | 15 | 100.0% |
| 11 | Complete Solar | 12 | 0 | 0.0% |
| 12 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 11 | 9 | 81.8% |
| 13 | Empower Electric Solar | 10 | 8 | 80.0% |
| 14 | Powur PBC (Powur Home) | 9 | 8 | 88.9% |
| 15 | SKYLINE SMART ENERGY | 9 | 7 | 77.8% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 618 of Covina’s 621 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (255, 41.3%) used modules recorded as Qcells.
In the last 24 months, 621 of Covina’s 621 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (321, 51.7%) used inverters recorded as Enphase.
In the last 24 months, 385 of Covina’s 621 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (213, 55.3%) used batteries recorded as Tesla.
637 of 668 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 255 | 885 |
| LONGi | 89 | 249 | |
| JA Solar | 56 | 145 | |
| Canadian Solar | 41 | 257 | |
| United Renewable Energy | 30 | not in top list | |
| Inverter maker | Enphase | 321 | 1,582 |
| Tesla | 190 | 273 | |
| SolarEdge | 110 | 1,162 | |
| Qcells | 9 | not in top list | |
| Delta Electronics | 6 | 55 | |
| Battery maker | Tesla | 213 | 288 |
| Enphase | 103 | 161 | |
| SolarEdge | 57 | 95 | |
| FranklinWH | 3 | 6 | |
| Lunar Energy | 3 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,281 of 3,828 installs, inverters on 3,828. See the methodology and the equipment index.
ZIP codes in Covina
ZIP codes with their own page where the utilities recorded Covina on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Covina
The SGIP report lists 106 battery storage projects with the city Covina, 54 with the status Paid ($539,751 in current incentive allocations, 1,691 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 54 | 1,691 | $539,751 |
| Reserved | 9 | 1,600 | $461,613 |
| Pending Reservation | 4 | 58 | $133,164 |
| Waitlist | 2 | 28 | $46,587 |
| Cancelled | 35 | 2,631 | $1,727,566 |
| RRF Rejected | 2 | 22 | $3,999 |
Installers named on the most SGIP storage projects in Covina
18 of the 106 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Covina is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 3,828
- Last 24 months
- 621
- Capacity
- 25 MW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 17.5% all time; 63.9% last 24 months
- Third-party owned
- 37.1% where reported
- Ownership types recorded
- PPA 996, lease 271, prepaid lease 9, other 49
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 1, 2002
Common questions
How many homes in Covina have solar?
3,828 residential solar systems in Covina were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 621 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Covina?
104 installer names have at least one install interconnected in Covina in the last 24 months, and 506 appear in the full record.
How common are batteries with new solar in Covina?
17.5% of the solar installs interconnected in Covina include battery storage across all years, and 63.9% in the last 24 months (397 of 621).
How many solar installs in Covina are under NEM 3.0?
880 of the 3,828 residential solar installs in Covina (23.0% of the 3,828 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 57.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.