How many solar installs has SUNTERNAL CONSTRUCTION INC done in California, and which license number is on its installs?

SUNTERNAL CONSTRUCTION INC has 854 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Apr 20, 2021 to Apr 29, 2026), most of them in Santa Clara County (351), Monterey County (124) and Los Angeles County (113). The license number recorded on most of its installs, 1036536, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
854
Last 24 months
64
Total capacity
5,149.3 kW DC
Median system size
5.5 kW DC
With battery storage
24.6% all time; 90.6% last 24 months
Third-party owned
2.6% of 854 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
167 installs, latest Apr 29, 2026
Ownership types recorded
PPA 22
Median battery size
19.7 kWh (18 installs list a capacity)
First install
Apr 20, 2021
Latest install
Apr 29, 2026
Counties
25
Utilities
PGE 712, SCE 142
CSLB license
1036536

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021907
202228722
202329623
2024174153
202564
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

167 of its 854 interconnected installs (19.6% of the 854 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.1%not counted
NEM 2.068680.3%47 (6.9%)
Net Billing Tariff16719.6%162 (97.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 22 of SUNTERNAL CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 22, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SUNTERNAL CONSTRUCTION INC exactly.

Third-party owner named on its installsInstalls
LightReach21
Light Reach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 60 of SUNTERNAL CONSTRUCTION INC’s 64 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 73.3%) used modules recorded as Hyundai.

In the last 24 months, 64 of SUNTERNAL CONSTRUCTION INC’s 64 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (62, 96.9%) used inverters recorded as Enphase.

In the last 24 months, 54 of SUNTERNAL CONSTRUCTION INC’s 64 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (54, 100.0%) used batteries recorded as Enphase.

195 of 210 battery-paired PG&E and SCE installs (92.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai4494
Qcells6329
REC316
Sonali Energees USA LLC3not in top list
EMMVEE Photovoltaic Power Private Limited2not in top list
Inverter makerEnphase62763
SolarEdge252
FranklinWH124
Battery makerEnphase54167

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 815 of 854 installs, inverters on 854. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNTERNAL CONSTRUCTION INC as developer on 9 battery storage projects and as installer on 12 (7 name it as both), 14 projects in all with 303 kWh of storage. 9 have the status Paid, with $194,522 in current incentive allocations. Applications were received from May 18, 2020 to Aug 15, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9217$194,522
Cancelled476$64,505
RRF Rejected110$1,303

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency11273$255,4988$192,449
Small Residential Storage220$3,5291$2,073
Not stated110$1,3030$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1036536Not found in the CSLB License Master file pulled Nov 4, 2026854

License numbers are the ones the utilities recorded on the interconnection applications (854 of 854 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SUNTERNAL CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated Marin County103653611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara351
Monterey124
Los Angeles113
San Benito55
Alameda40
San Francisco37
San Mateo24
Santa Cruz23
Contra Costa21
San Bernardino16
Merced9
Solano8
Orange6
Marin4
San Joaquin4
Ventura4
Riverside3
Calaveras2
El Dorado2
Fresno2
Sonoma2
Nevada1
San Luis Obispo1
Stanislaus1
Yolo1

Top cities

CityInstalls
San Jose231
Salinas78
Hollister51
San Francisco37
Gilroy36
Morgan Hill32
Marina28
Oakland18
Watsonville15
Saratoga13
Campbell12
Covina12
Monrovia11
Sunnyvale10
Whittier9

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNTERNAL CONSTRUCTION INC854

Common questions

Where does SUNTERNAL CONSTRUCTION INC install solar?

Its installs are spread across 25 counties. The most are in Santa Clara County (351 installs), followed by Monterey County (124).

How often does SUNTERNAL CONSTRUCTION INC install batteries with solar?

24.6% of its interconnected solar installs include battery storage across all years, and 90.6% in the last 24 months (58 of 64).

How many SUNTERNAL CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

167 of its 854 interconnected installs (19.6% of the 854 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.