Sunergy

How many solar installs has Sunergy done in California, and which license number is on its installs?

Sunergy has 625 residential solar installs interconnected in California, active in the records from 2004 through 2026 (Apr 16, 2004 to Aug 27, 2026), most of them in Orange County (195), Los Angeles County (78) and Santa Clara County (69). CSLB lists license 1061794 (SUNERGY INC) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
625
Last 24 months
447
Total capacity
4,879.8 kW DC
Median system size
7.2 kW DC
With battery storage
77.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 621 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
466 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (195 installs list a capacity)
First install
Apr 16, 2004
Latest install
Aug 27, 2026
Counties
24
Utilities
SCE 286, PGE 246, SDGE 93
CSLB license
1061794

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200420
200500
200600
200710
200800
200920
201000
201100
201200
201300
201400
201510
201600
201700
201800
201900
2020170
2021303
2022464
2023465
20247967
2025144113
2026 (through Aug 31, 2026)257219

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

466 of its 625 interconnected installs (74.6% of the 625 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.091.4%not counted
NEM 2.015024.0%16 (15.7%)
Net Billing Tariff46674.6%394 (93.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunergy’s installs. Across all installers, 8 residential systems list a third-party owner name that matches Sunergy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 444 of Sunergy’s 447 installs name a module maker in the “Generator Manufacturer” fields, and most of those (368, 82.9%) used modules recorded as REC.

In the last 24 months, 447 of Sunergy’s 447 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (443, 99.1%) used inverters recorded as Enphase.

In the last 24 months, 377 of Sunergy’s 447 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (374, 99.2%) used batteries recorded as Enphase.

410 of 411 battery-paired PG&E and SCE installs (99.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC368418
JA Solar6667
Qcells614
Solaria3112
SunPower3not in top list
Inverter makerEnphase443558
SolarEdge542
SMA34
Fronius1not in top list
Power-One1not in top list
Battery makerEnphase374408
Encharger11
FranklinWH11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 615 of 625 installs, inverters on 623. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunergy as developer on 50 battery storage projects and as installer on 53 (50 name it as both), 53 projects in all with 1,632 kWh of storage. 11 have the status Paid, with $173,470 in current incentive allocations. Applications were received from May 11, 2020 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11227$173,470
Reserved115$15,000
Pending Reservation119$2,818
Cancelled401,371$1,279,909

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency451,494$1,447,0786$164,687
Small Residential Storage7100$14,6015$8,783
Large-Scale Storage138$9,5180$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1061794SUNERGY INC (Corporation)Contr Bond SuspC-10 Electrical Contractor; C-46 Solar ContractorDec 30, 2019Dec 31, 2027619

License numbers are the ones the utilities recorded on the interconnection applications (619 of 625 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1061794. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sunergy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20242025Total
City and County of San Francisco1061794011
unincorporated San Diego County1061794123

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange195
Los Angeles78
Santa Clara69
Alameda56
San Diego42
Contra Costa40
San Mateo35
Riverside19
Ventura19
San Bernardino16
San Luis Obispo8
Santa Barbara8
Kern7
San Joaquin7
Santa Cruz7
Butte4
Solano4
Fresno3
Merced3
Amador1
El Dorado1
Inyo1
Placer1
Tulare1

Top cities

CityInstalls
Rch Msn Viejo36
San Jose34
San Diego20
Irvine19
Long Beach19
Oakland15
Huntington Beach14
Garden Grove11
Orange10
Fremont9
Los Alamitos8
Mission Viejo8
Santa Ana8
Seal Beach8
Lake Forest7

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNERGY INC527
Sunergy95
SUNERGY2
Sunergy, Inc.1

Common questions

Where does Sunergy install solar?

Its installs are spread across 24 counties. The most are in Orange County (195 installs), followed by Los Angeles County (78).

How often does Sunergy install batteries with solar?

77.3% of its interconnected solar installs include battery storage across all years, and 92.6% in the last 24 months (376 of 406). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunergy installs are under NEM 3.0 (the Net Billing Tariff)?

466 of its 625 interconnected installs (74.6% of the 625 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.