SOLARUNION

How many solar installs has SOLARUNION done in California, and which license number is on its installs?

SOLARUNION has 637 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 7, 2019 to Jul 7, 2026), most of them in San Francisco County (219), Alameda County (128) and San Mateo County (60). The license number recorded on most of its installs, 990354, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
637
Last 24 months
17
Total capacity
3,748.9 kW DC
Median system size
5.2 kW DC
With battery storage
13.3% all time; 23.5% last 24 months
Third-party owned
0.0% of 637 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Dec 4, 2025
Ownership types recorded
none recorded
Median battery size
10.2 kWh (84 installs list a capacity)
First install
Oct 7, 2019
Latest install
Jul 7, 2026
Counties
34
Utilities
PGE 619, SCE 18
CSLB license
990354

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019292
202010311
202112918
202214134
202316512
2024574
2025114
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 637 interconnected installs (0.8% of the 637 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 4, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030.5%not counted
NEM 2.062998.7%81 (12.9%)
Net Billing Tariff50.8%1 (20.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLARUNION’s installs. No residential system in the file lists a third-party owner name that matches SOLARUNION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of SOLARUNION’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 53.3%) used modules recorded as Qcells.

In the last 24 months, 17 of SOLARUNION’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 70.6%) used inverters recorded as SolarEdge.

In the last 24 months, 2 of SOLARUNION’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as LG.

51 of 85 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells8111
Panasonic4220
Canadian Solar1not in top list
REC1not in top list
Silfab1not in top list
Inverter makerSolarEdge12384
Enphase426
ABB16
GoodWe Technologies Co., Ltd.1not in top list
SMA1232
Battery makerLG136
SolarEdge12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 572 of 637 installs, inverters on 636. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLARUNION as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 15 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 13, 2025 to Jun 13, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
RRF Rejected115$2,257

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated115$2,2570$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990354Not found in the CSLB License Master file pulled Nov 4, 2026637

License numbers are the ones the utilities recorded on the interconnection applications (637 of 637 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SOLARUNION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
City and County of San Francisco990354505251294839232294
unincorporated Marin County990354611000008

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Francisco219
Alameda128
San Mateo60
Contra Costa51
Santa Clara36
Marin23
San Joaquin19
Sonoma12
Solano11
Monterey9
Napa9
Mendocino7
Yolo7
Orange6
El Dorado5
Los Angeles4
Santa Cruz4
Lake3
Santa Barbara3
Tulare3
Amador2
Fresno2
Kern2
San Bernardino2
Butte1
Humboldt1
Mariposa1
Nevada1
Placer1
Riverside1
San Benito1
San Luis Obispo1
Shasta1
Ventura1

Top cities

CityInstalls
San Francisco219
Oakland61
Berkeley36
San Jose14
Redwood City10
San Mateo10
Stockton10
Mountain View9
Napa8
Concord7
San Rafael7
Santa Rosa7
Castro Valley6
Manteca6
Novato6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLARUNION637

Common questions

Where does SOLARUNION install solar?

Its installs are spread across 34 counties. The most are in San Francisco County (219 installs), followed by Alameda County (128).

How often does SOLARUNION install batteries with solar?

13.3% of its interconnected solar installs include battery storage across all years, and 23.5% in the last 24 months (4 of 17).

How many SOLARUNION installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 637 interconnected installs (0.8% of the 637 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 20.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.