Solar installers in Berkeley, California
Most installs here are in Alameda County.
Who installs the most solar in Berkeley?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Berkeley are A1 Sun, Inc. (73), Sun Light and Power (45) and BRIGHT OPS (42). They account for 160 of the 696 residential solar installs interconnected there in that window.
In all, 5,615 homes in Berkeley have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 132 installers with installs in this window. 25 installs in the window were self-installed or had no installer recorded.
| 1 | A1 Sun, Inc. | 73 | 465 |
| 2 | Sun Light and Power | 45 | 271 |
| 3 | BRIGHT OPS | 42 | 42 |
| 4 | Sunrun | 39 | 266 |
| 5 | Solar Technologies | 36 | 157 |
| 6 | Albion Power Company | 16 | 105 |
| 7 | GOT WATTS ELECTRIC, SOLAR & HVAC | 15 | 42 |
| 8 | SunPower | 14 | 270 |
| 9 | Tesla Energy Operations (formerly SolarCity) | 13 | 502 |
| 10 | ALLY ELECTRIC | 12 | 45 |
| 11 | EARTHWISE ENERGY SOLUTIONS LLC | 12 | 23 |
| 12 | NRG Clean Power | 12 | 73 |
| 13 | Save a Lot Solar | 12 | 116 |
| 14 | YOUR ENERGY SOLUTIONS | 12 | 61 |
| 15 | FREEDOM FOREVER LLC | 11 | 38 |
| 16 | Citadel Roofing and Solar | 10 | 16 |
| 17 | ROCKIN ROOFERS | 10 | 67 |
| 18 | Semper Solaris Construction Inc | 10 | 65 |
| 19 | Super Solar | 10 | 111 |
| 20 | Synergy Power | 10 | 37 |
| 21 | American Array Solar | 8 | 24 |
| 22 | SIERRA ROOFING AND SOLAR INC | 8 | 21 |
| 23 | SunWork Renewable Energy Projects | 8 | 60 |
| 24 | AMECO SOLAR LLC | 7 | 9 |
| 25 | Nexus Energy Systems | 7 | 21 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 502 | 502 |
| 2 | A1 Sun, Inc. | 465 | 465 |
| 3 | Sun Light and Power | 271 | 271 |
| 4 | SunPower | 270 | 270 |
| 5 | Sunrun | 266 | 266 |
| 6 | Sungevity, Inc. | 226 | 226 |
| 7 | Kota Construction LLC | 204 | 204 |
| 8 | Solar Technologies | 157 | 157 |
| 9 | Save a Lot Solar | 116 | 116 |
| 10 | Super Solar | 111 | 111 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 563 | 156 |
| 2023 | 810 | 150 |
| 2024 | 406 | 174 |
| 2025 | 310 | 218 |
| 2026 (through Aug 31, 2026) | 286 | 224 |
Under the Net Billing Tariff (NEM 3.0)
645 of the 5,615 residential solar installs in Berkeley (11.5% of the 5,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The latest was approved Aug 26, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Berkeley
| 1 | A1 Sun, Inc. | 61 | 49 | 80.3% |
| 2 | Sun Light and Power | 55 | 49 | 89.1% |
| 3 | BRIGHT OPS | 42 | 42 | 100.0% |
| 4 | Sunrun | 41 | 41 | 100.0% |
| 5 | Solar Technologies | 25 | 23 | 92.0% |
| 6 | GOT WATTS ELECTRIC, SOLAR & HVAC | 18 | 16 | 88.9% |
| 7 | Albion Power Company | 17 | 14 | 82.4% |
| 8 | ROCKIN ROOFERS | 17 | 17 | 100.0% |
| 9 | Tesla Energy Operations (formerly SolarCity) | 16 | 16 | 100.0% |
| 10 | ALLY ELECTRIC | 14 | 10 | 71.4% |
| 11 | Save a Lot Solar | 13 | 13 | 100.0% |
| 12 | FREEDOM FOREVER LLC | 12 | 11 | 91.7% |
| 13 | SunPower | 12 | 6 | 50.0% |
| 14 | EARTHWISE ENERGY SOLUTIONS LLC | 11 | 10 | 90.9% |
| 15 | NRG Clean Power | 11 | 11 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 650 of Berkeley’s 696 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (180, 27.7%) used modules recorded as REC.
In the last 24 months, 696 of Berkeley’s 696 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (369, 53.0%) used inverters recorded as Enphase.
In the last 24 months, 449 of Berkeley’s 696 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (205, 45.7%) used batteries recorded as Tesla.
1,035 of 1,203 battery-paired PG&E and SCE installs (86.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 180 | 613 |
| Qcells | 139 | 788 | |
| Hyundai | 63 | not in top list | |
| JA Solar | 59 | not in top list | |
| SunPower | 50 | 756 | |
| Inverter maker | Enphase | 369 | 2,263 |
| Tesla | 243 | 605 | |
| SolarEdge | 85 | 1,082 | |
| FranklinWH | 41 | not in top list | |
| SMA | 24 | 556 | |
| Battery maker | Tesla | 205 | 499 |
| Enphase | 162 | 265 | |
| FranklinWH | 38 | 49 | |
| SolarEdge | 20 | 30 | |
| Lunar Energy | 7 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,264 of 5,615 installs, inverters on 5,613. See the methodology and the equipment index.
ZIP codes in Berkeley
ZIP codes with their own page where the utilities recorded Berkeley on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 94707 | 1,011 | 1,360 | 165 |
| 94702 | 975 | 976 | 108 |
| 94703 | 954 | 954 | 130 |
| 94705 | 897 | 971 | 114 |
| 94708 | 895 | 1,093 | 148 |
| 94710 | 323 | 324 | 39 |
| 94709 | 264 | 264 | 32 |
| 94704 | 169 | 170 | 31 |
| 94706 | 123 | 914 | 134 |
SGIP battery storage projects in Berkeley
The SGIP report lists 561 battery storage projects with the city Berkeley, 395 with the status Paid ($2,311,139 in current incentive allocations, 6,913 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 395 | 6,913 | $2,311,139 |
| Reserved | 23 | 5,538 | $990,055 |
| Pending Reservation | 4 | 76 | $146,085 |
| Cancelled | 119 | 11,469 | $7,866,320 |
| RRF Rejected | 20 | 288 | $48,388 |
Installers named on the most SGIP storage projects in Berkeley
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 89 | 67 |
| SunPower | 58 | 37 |
| A1 Sun, Inc. | 48 | 42 |
| Tesla | 29 | 26 |
| Hooked On Solar | 24 | 19 |
| Sunrun | 24 | 16 |
| Ally Electric and Solar Inc | 22 | 19 |
| Solar Technologies | 22 | 20 |
| SunLogic Inc. | 22 | 20 |
| Infinity Energy, Inc | 21 | 12 |
31 of the 561 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Berkeley is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 5,615
- Last 24 months
- 696
- Capacity
- 26 MW DC
- Median system size
- 4.1 kW DC
- With battery storage
- 21.4% all time; 71.6% last 24 months
- Third-party owned
- 7.0% where reported
- Ownership types recorded
- PPA 318, lease 55, prepaid lease 14, other 8
- Median battery size
- 13.5 kWh
- Earliest install in data
- Sep 9, 1998
Common questions
How many homes in Berkeley have solar?
5,615 residential solar systems in Berkeley were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 696 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Berkeley?
132 installer names have at least one install interconnected in Berkeley in the last 24 months, and 480 appear in the full record.
How common are batteries with new solar in Berkeley?
21.4% of the solar installs interconnected in Berkeley include battery storage across all years, and 71.6% in the last 24 months (498 of 696).
How many solar installs in Berkeley are under NEM 3.0?
645 of the 5,615 residential solar installs in Berkeley (11.5% of the 5,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.