Solar installers in Castro Valley, California

Most installs here are in Alameda County.

Who installs the most solar in Castro Valley?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Castro Valley are Sunrun (138), Tesla Energy Operations (formerly SolarCity) (56) and BRIGHT OPS (45). They account for 239 of the 514 residential solar installs interconnected there in that window.

In all, 3,860 homes in Castro Valley have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 94 installers with installs in this window. 15 installs in the window were self-installed or had no installer recorded.

1Sunrun138436
2Tesla Energy Operations (formerly SolarCity)56612
3BRIGHT OPS4549
4Solar Optimum Inc.1962
5Synergy Power19145
6FREEDOM FOREVER LLC1440
7NRG Clean Power1343
8Semper Solaris Construction Inc12112
9YOUR ENERGY SOLUTIONS1172
10AXIA SOLAR CORP88
11American Array Solar625
12BETTER EARTH ELECTRIC INC675
13Nexus Energy Systems624
14POWUR HOME CONSTRUCTION67
15SUNLIGHT ELECTRI-CAL SOLUTIONS610
16GOT WATTS ELECTRIC, SOLAR & HVAC511
17High Definition Solar556
18AMECO SOLAR LLC48
19ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING415
20Integrated Energy Group LLC44
21SUNNOVA ENERGY CORPORATION44
22SunWork Renewable Energy Projects49
23UNITED SOLAR ELECTRIC418
24Citadel Roofing and Solar311
25Clean Solar322

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)612612
2Sunrun436436
3Vivint Solar Developer, LLC287287
4SunPower237237
5Synergy Power145145
6Semper Solaris Construction Inc112112
7BETTER EARTH ELECTRIC INC7575
8The Solar Company7272
9YOUR ENERGY SOLUTIONS7272
10PetersenDean6363

Installs by year

YearInstalls interconnectedWith battery storage
2022512128
202352491
2024239174
2025292210
2026 (through Aug 31, 2026)148115

Under the Net Billing Tariff (NEM 3.0)

537 of the 3,860 residential solar installs in Castro Valley (13.9% of the 3,860 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The latest was approved Aug 25, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Castro Valley

1Sunrun106106100.0%
2Tesla Energy Operations (formerly SolarCity)727097.2%
3BRIGHT OPS4949100.0%
4Synergy Power242395.8%
5Solar Optimum Inc.191894.7%
6Semper Solaris Construction Inc161275.0%
7FREEDOM FOREVER LLC151493.3%
8NRG Clean Power151280.0%
9SunPower12541.7%
10YOUR ENERGY SOLUTIONS10880.0%
11American Array Solar99100.0%
12BETTER EARTH ELECTRIC INC99100.0%
13AXIA SOLAR CORP8787.5%
14GOT WATTS ELECTRIC, SOLAR & HVAC88100.0%
15V3 Electric8675.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 490 of Castro Valley’s 514 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (202, 41.2%) used modules recorded as Qcells.

In the last 24 months, 514 of Castro Valley’s 514 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (255, 49.6%) used inverters recorded as Tesla.

In the last 24 months, 338 of Castro Valley’s 514 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (204, 60.4%) used batteries recorded as Tesla.

791 of 904 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells202668
JA Solar72167
REC54329
LONGi27not in top list
Panasonic19172
Inverter makerTesla255597
Enphase1961,356
SolarEdge781,068
FranklinWH12not in top list
Qcells9not in top list
Battery makerTesla204472
Enphase62105
SolarEdge4765
FranklinWH1218
LG688

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,629 of 3,860 installs, inverters on 3,860. See the methodology and the equipment index.

ZIP codes in Castro Valley

ZIP codes with their own page where the utilities recorded Castro Valley on at least 10% of the ZIP’s installs, through Aug 31, 2026.

945462,5872,599380
945521,2611,265134

SGIP battery storage projects in Castro Valley

The SGIP report lists 317 battery storage projects with the city Castro Valley, 218 with the status Paid ($1,880,868 in current incentive allocations, 4,009 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid2184,009$1,880,868
PBI in Process1348$134,400
Reserved132,653$849,058
Cancelled771,335$719,950
RRF Rejected8102$15,262

Installers named on the most SGIP storage projects in Castro Valley

InstallerProjectsPaid
Semper Solaris Construction Inc7859
SunPower2825
Tesla2821
Sunrun2312
Solar Optimum Inc.2012
Hooked On Solar139
LA Solar Group127
Tesla Energy Operations (formerly SolarCity)1210
Infinity Energy, Inc108
Synergy Power108

6 of the 317 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
3,860
Last 24 months
514
Capacity
21.8 MW DC
Median system size
5.2 kW DC
With battery storage
23.4% all time; 76.1% last 24 months
Third-party owned
20.3% where reported
Ownership types recorded
PPA 691, lease 76, prepaid lease 8, other 7
Median battery size
13.5 kWh
Earliest install in data
Jul 18, 2001

Common questions

How many homes in Castro Valley have solar?

3,860 residential solar systems in Castro Valley were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 514 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Castro Valley?

94 installer names have at least one install interconnected in Castro Valley in the last 24 months, and 365 appear in the full record.

How common are batteries with new solar in Castro Valley?

23.4% of the solar installs interconnected in Castro Valley include battery storage across all years, and 76.1% in the last 24 months (391 of 514).

How many solar installs in Castro Valley are under NEM 3.0?

537 of the 3,860 residential solar installs in Castro Valley (13.9% of the 3,860 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.