Solar installers in Castro Valley, California
Most installs here are in Alameda County.
Who installs the most solar in Castro Valley?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Castro Valley are Sunrun (138), Tesla Energy Operations (formerly SolarCity) (56) and BRIGHT OPS (45). They account for 239 of the 514 residential solar installs interconnected there in that window.
In all, 3,860 homes in Castro Valley have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 94 installers with installs in this window. 15 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 612 | 612 |
| 2 | Sunrun | 436 | 436 |
| 3 | Vivint Solar Developer, LLC | 287 | 287 |
| 4 | SunPower | 237 | 237 |
| 5 | Synergy Power | 145 | 145 |
| 6 | Semper Solaris Construction Inc | 112 | 112 |
| 7 | BETTER EARTH ELECTRIC INC | 75 | 75 |
| 8 | The Solar Company | 72 | 72 |
| 9 | YOUR ENERGY SOLUTIONS | 72 | 72 |
| 10 | PetersenDean | 63 | 63 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 512 | 128 |
| 2023 | 524 | 91 |
| 2024 | 239 | 174 |
| 2025 | 292 | 210 |
| 2026 (through Aug 31, 2026) | 148 | 115 |
Under the Net Billing Tariff (NEM 3.0)
537 of the 3,860 residential solar installs in Castro Valley (13.9% of the 3,860 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The latest was approved Aug 25, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Castro Valley
| 1 | Sunrun | 106 | 106 | 100.0% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 72 | 70 | 97.2% |
| 3 | BRIGHT OPS | 49 | 49 | 100.0% |
| 4 | Synergy Power | 24 | 23 | 95.8% |
| 5 | Solar Optimum Inc. | 19 | 18 | 94.7% |
| 6 | Semper Solaris Construction Inc | 16 | 12 | 75.0% |
| 7 | FREEDOM FOREVER LLC | 15 | 14 | 93.3% |
| 8 | NRG Clean Power | 15 | 12 | 80.0% |
| 9 | SunPower | 12 | 5 | 41.7% |
| 10 | YOUR ENERGY SOLUTIONS | 10 | 8 | 80.0% |
| 11 | American Array Solar | 9 | 9 | 100.0% |
| 12 | BETTER EARTH ELECTRIC INC | 9 | 9 | 100.0% |
| 13 | AXIA SOLAR CORP | 8 | 7 | 87.5% |
| 14 | GOT WATTS ELECTRIC, SOLAR & HVAC | 8 | 8 | 100.0% |
| 15 | V3 Electric | 8 | 6 | 75.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 490 of Castro Valley’s 514 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (202, 41.2%) used modules recorded as Qcells.
In the last 24 months, 514 of Castro Valley’s 514 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (255, 49.6%) used inverters recorded as Tesla.
In the last 24 months, 338 of Castro Valley’s 514 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (204, 60.4%) used batteries recorded as Tesla.
791 of 904 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 202 | 668 |
| JA Solar | 72 | 167 | |
| REC | 54 | 329 | |
| LONGi | 27 | not in top list | |
| Panasonic | 19 | 172 | |
| Inverter maker | Tesla | 255 | 597 |
| Enphase | 196 | 1,356 | |
| SolarEdge | 78 | 1,068 | |
| FranklinWH | 12 | not in top list | |
| Qcells | 9 | not in top list | |
| Battery maker | Tesla | 204 | 472 |
| Enphase | 62 | 105 | |
| SolarEdge | 47 | 65 | |
| FranklinWH | 12 | 18 | |
| LG | 6 | 88 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,629 of 3,860 installs, inverters on 3,860. See the methodology and the equipment index.
ZIP codes in Castro Valley
ZIP codes with their own page where the utilities recorded Castro Valley on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Castro Valley
The SGIP report lists 317 battery storage projects with the city Castro Valley, 218 with the status Paid ($1,880,868 in current incentive allocations, 4,009 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 218 | 4,009 | $1,880,868 |
| PBI in Process | 1 | 348 | $134,400 |
| Reserved | 13 | 2,653 | $849,058 |
| Cancelled | 77 | 1,335 | $719,950 |
| RRF Rejected | 8 | 102 | $15,262 |
Installers named on the most SGIP storage projects in Castro Valley
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 78 | 59 |
| SunPower | 28 | 25 |
| Tesla | 28 | 21 |
| Sunrun | 23 | 12 |
| Solar Optimum Inc. | 20 | 12 |
| Hooked On Solar | 13 | 9 |
| LA Solar Group | 12 | 7 |
| Tesla Energy Operations (formerly SolarCity) | 12 | 10 |
| Infinity Energy, Inc | 10 | 8 |
| Synergy Power | 10 | 8 |
6 of the 317 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 3,860
- Last 24 months
- 514
- Capacity
- 21.8 MW DC
- Median system size
- 5.2 kW DC
- With battery storage
- 23.4% all time; 76.1% last 24 months
- Third-party owned
- 20.3% where reported
- Ownership types recorded
- PPA 691, lease 76, prepaid lease 8, other 7
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jul 18, 2001
Common questions
How many homes in Castro Valley have solar?
3,860 residential solar systems in Castro Valley were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 514 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Castro Valley?
94 installer names have at least one install interconnected in Castro Valley in the last 24 months, and 365 appear in the full record.
How common are batteries with new solar in Castro Valley?
23.4% of the solar installs interconnected in Castro Valley include battery storage across all years, and 76.1% in the last 24 months (391 of 514).
How many solar installs in Castro Valley are under NEM 3.0?
537 of the 3,860 residential solar installs in Castro Valley (13.9% of the 3,860 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.