O'Solar Mio

How many solar installs has O'Solar Mio done in California, and which license number is on its installs?

O'Solar Mio has 143 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jun 9, 2010 to May 18, 2026), most of them in Fresno County (39), Tulare County (37) and Placer County (12). CSLB lists license 1066952 (O SOLAR MIO LLC) with status Judgement Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
143
Last 24 months
16
Total capacity
1,108.7 kW DC
Median system size
6.9 kW DC
With battery storage
4.9% all time; 18.8% last 24 months
Third-party owned
1.4% of 143 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest May 18, 2026
Ownership types recorded
PPA 1, other 1
Median battery size
16 kWh (1 installs list a capacity)
First install
Jun 9, 2010
Latest install
May 18, 2026
Counties
21
Utilities
PGE 129, SCE 14
CSLB license
1066952

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
2011180
201290
201320
201400
201500
201600
201700
201800
201910
202030
2021110
2022210
2023441
2024204
202581
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 143 interconnected installs (14.7% of the 143 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 23.8% of those include battery storage. The latest Net Billing Tariff install was approved May 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03021.0%not counted
NEM 2.09264.3%2 (2.2%)
Net Billing Tariff2114.7%5 (23.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of O'Solar Mio’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 1. Across all installers, 2 residential systems list a third-party owner name that matches O'Solar Mio exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
O Solar Mio2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of O'Solar Mio’s 16 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 50.0%) used modules recorded as Znshine.

In the last 24 months, 16 of O'Solar Mio’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of O'Solar Mio’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used batteries recorded as Enphase.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine68
EMMVEE Photovoltaic Power Private Limited2not in top list
Qcells235
VSUN (Vietnam Sunergy)2not in top list
REC1not in top list
Inverter makerEnphase12101
SolarEdge228
Tesla1not in top list
Tigo Energy, Inc1not in top list
Battery makerEnphase14
LG11
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 143 installs, inverters on 143. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names O'Solar Mio as developer on 23 battery storage projects and as installer on 23 (23 name it as both), 23 projects in all with 361 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 3, 2025 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved13196$288,508
Pending Reservation115$22,247
Cancelled9151$217,923

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU23361$528,6790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1066952O SOLAR MIO LLC (Limited Liability)Judgement SuspC-10 Electrical ContractorJul 14, 2020Jul 31, 2028112

License numbers are the ones the utilities recorded on the interconnection applications (112 of 143 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1066952. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno39
Tulare37
Placer12
San Joaquin8
Contra Costa7
Merced7
El Dorado5
Kern5
Butte4
Madera3
Mendocino3
Nevada2
Shasta2
Stanislaus2
Alameda1
Santa Clara1
Solano1
Sonoma1
Sutter1
Yolo1
Yuba1

Top cities

CityInstalls
Fresno27
Orosi9
Cutler8
Dinuba5
Rocklin5
Stockton5
Visalia5
Kerman4
Los Banos4
Clovis3
Delano3
Madera3
Richmond3
Willits3
Chico2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
O SOLAR MIO LLC112
O'Solar Mio24
O' Solar Mio5
O Solar Mio, Llc1
O'solar Mio1

Common questions

Where does O'Solar Mio install solar?

Its installs are spread across 21 counties. The most are in Fresno County (39 installs), followed by Tulare County (37).

How often does O'Solar Mio install batteries with solar?

4.9% of its interconnected solar installs include battery storage across all years, and 18.8% in the last 24 months (3 of 16).

How many O'Solar Mio installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 143 interconnected installs (14.7% of the 143 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 23.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.