Ion Solar
How many solar installs has Ion Solar done in California, and which license number is on its installs?
Ion Solar has 275 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Mar 6, 2017 to May 28, 2019), most of them in Sutter County (40), Contra Costa County (37) and Butte County (35). The license number recorded on most of its installs, 1027027, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 853582 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027, recorded on 14 of its installs.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Ion Solar here carry more than one CSLB license number: 1027027 on 168 (not found in the CSLB License Master file), 1014325 on 90 (not found in the CSLB License Master file) and 853582 on 14 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 275
- Last 24 months
- 0
- Total capacity
- 1,612.1 kW DC
- Median system size
- 5.6 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 12.4% of 275 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 25, lease 6, other 3
- First install
- Mar 6, 2017
- Latest install
- May 28, 2019
- Counties
- 26
- Utilities
- PGE 253, SCE 22
- CSLB license
- 1027027, 1014325, 853582
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 182 | 0 |
| 2018 | 92 | 0 |
| 2019 | 1 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 275 interconnected installs with a tariff recorded (275) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 12 | 4.4% | not counted |
| NEM 2.0 | 263 | 95.6% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 34 of Ion Solar’s installs the utility recorded a third-party ownership type: PPA 25, lease 6, prepaid lease 0, other 3. Across all installers, 52 residential systems list a third-party owner name that matches Ion Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Sunnova | 32 |
| Ion solar | 1 |
| Spruce | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 257 of Ion Solar’s 275 installs name a module maker in the “Generator Manufacturer” fields, and most of those (232, 90.3%) used modules recorded as Trina Solar.
Across all years, 275 of Ion Solar’s 275 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (266, 96.7%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Trina Solar | 0 | 232 |
| Silfab | 0 | 24 | |
| LG | 0 | 1 | |
| Inverter maker | Enphase | 0 | 266 |
| SolarEdge | 0 | 9 | |
| SMA | 0 | 6 | |
| ABB | 0 | 2 | |
| Fronius | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 257 of 275 installs, inverters on 275. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Ion Solar as developer on 3 battery storage projects and as installer on 0 (0 name it as both), 3 projects in all with 40 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 5, 2017 to Jun 5, 2017.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Cancelled | 3 | 40 | $12,355 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 3 | 40 | $12,355 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1027027 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 168 | ||||
| 1014325 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 90 | ||||
| 853582 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Jan 25, 2005 | Jan 31, 2027 | 14 |
License numbers are the ones the utilities recorded on the interconnection applications (275 of 275 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 853582. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Vision Solar: 879 installs, license 1027027
- Zing Solar: 813 installs, license 1027027
- ION Developer LLC: 60 installs, license 1027027
- Vision Solar: 879 installs, license 853582
- Vision Installation: 270 installs, license 853582
Counties
Top cities
| City | Installs |
|---|---|
| Yuba City | 35 |
| Marysville | 15 |
| Oroville | 14 |
| Chico | 13 |
| Orland | 11 |
| Pittsburg | 11 |
| Vacaville | 11 |
| Vallejo | 11 |
| Antioch | 10 |
| Olivehurst | 10 |
| Corning | 7 |
| Colusa | 6 |
| Hamilton City | 6 |
| Woodland | 6 |
| Cathedral City | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Ion Solar | 177 |
| ION Solar | 94 |
| Ion solar | 2 |
| Ion SOlar | 1 |
| ION SOLAR | 1 |
Common questions
Where does Ion Solar install solar?
Its installs are spread across 26 counties. The most are in Sutter County (40 installs), followed by Contra Costa County (37).
How often does Ion Solar install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Ion Solar installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 275 interconnected installs with a tariff recorded (275) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.