Green NRG
How many solar installs has Green NRG done in California, and which license number is on its installs?
Green NRG has 511 residential solar installs interconnected in California, active in the records from 2014 through 2018 (Mar 3, 2014 to Aug 22, 2018), most of them in Los Angeles County (121), Alameda County (45) and Santa Clara County (45). CSLB lists license 909516 (GREEN NRG GROUP INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Mar 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 511
- Last 24 months
- 0
- Total capacity
- 2,540.7 kW DC
- Median system size
- 4.6 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 3.1% of 391 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 11, prepaid lease 1
- First install
- Mar 3, 2014
- Latest install
- Aug 22, 2018
- Counties
- 35
- Utilities
- PGE 277, SCE 229, SDGE 5
- CSLB license
- 909516
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 81 | 0 |
| 2015 | 227 | 0 |
| 2016 | 158 | 0 |
| 2017 | 37 | 0 |
| 2018 | 8 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 511 interconnected installs with a tariff recorded (511) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 470 | 92.0% | not counted |
| NEM 2.0 | 41 | 8.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 12 of Green NRG’s installs the utility recorded a third-party ownership type: PPA 0, lease 11, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Green NRG exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Clean Power Finance | 9 |
| Corinthian Energy LLC | 1 |
| KILOWATT SYSTEMS LLC | 1 |
| SUN RUN | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 358 of Green NRG’s 511 installs name a module maker in the “Generator Manufacturer” fields, and most of those (312, 87.2%) used modules recorded as SolarWorld.
Across all years, 511 of Green NRG’s 511 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (228, 44.6%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 312 |
| LG | 0 | 38 | |
| JinkoSolar | 0 | 5 | |
| Canadian Solar | 0 | 1 | |
| Mission Solar | 0 | 1 | |
| Inverter maker | Enphase | 0 | 228 |
| SolarEdge | 0 | 152 | |
| SMA | 0 | 115 | |
| ABB | 0 | 9 | |
| Power-One | 0 | 8 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 358 of 511 installs, inverters on 511. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 909516 | GREEN NRG GROUP INC (Corporation) | CLEAR, DISC Bond Filed | B General Building Contractor; C-46 Solar Contractor | Jan 23, 2008 | Mar 31, 2027 | 501 |
License numbers are the ones the utilities recorded on the interconnection applications (504 of 511 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
CSLB’s License Master file lists a disciplinary bond on license 909516 (bond reason recorded: Issuance), required Mar 28, 2023, $30,000, CSLB case number 2017000499, no cancellation date recorded. CSLB lists license 909516 under the business name GREEN NRG GROUP INC; the bond is on the license, as CSLB records it. Current CSLB record: 909516.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Counties
Top cities
| City | Installs |
|---|---|
| San Jose | 25 |
| Oakland | 14 |
| Palmdale | 11 |
| Fresno | 10 |
| Fremont | 9 |
| Hollister | 9 |
| Hayward | 8 |
| Lancaster | 8 |
| Paso Robles | 8 |
| Huntington Beach | 7 |
| Long Beach | 7 |
| San Francisco | 7 |
| Manteca | 6 |
| El Monte | 5 |
| Mission Viejo | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Green NRG | 265 |
| GREEN NRG | 239 |
| Green Nrg | 3 |
| green nrg | 2 |
| Green NRG, Inc | 2 |
Common questions
Where does Green NRG install solar?
Its installs are spread across 35 counties. The most are in Los Angeles County (121 installs), followed by Alameda County (45).
How often does Green NRG install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Green NRG installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 511 interconnected installs with a tariff recorded (511) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.