Home solar in ZIP code 95953, California

Service city recorded on most installs: Live Oak. County: Sutter County.

How many homes in ZIP code 95953 have solar?

PG&E, SCE and SDG&E interconnected 1,326 residential solar systems in ZIP code 95953 through Aug 31, 2026, 118 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Live Oak, Sutter County, as the service city on 1,326 of them. Citadel Roofing and Solar has the most installs recorded in this ZIP, 150.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
1,326
Last 24 months
118 (Sep 2024 through Aug 2026)
Capacity
9,012.6 kW DC
Median system size
6 kW DC
Net Billing Tariff (NEM 3.0)
168 installs, 12.7% of those with a tariff recorded
Utility
PGE 1,326
First install in data
Nov 9, 2004
Latest install in data
Aug 28, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200410
200500
200690
2007140
200840
200910
201000
201160
201240
201390
2014440
2015760
2016990
2017710
2018651
20191563
20201104
20211342
20221617
202317914
20249277
20255444
2026 (through Aug 31, 2026)3731

Battery storage

13.8% of the residential solar installs here include battery storage across all years (183 of 1,326). In the last 24 months the share was 86.4% (102 of 118).

Net metering tariff

Of the 1,326 installs with a net metering tariff recorded: NEM 1.0 274 (20.7%), NEM 2.0 884 (66.7%), the Net Billing Tariff (often called NEM 3.0) 168 (12.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

29.9% of the 1,326 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 930 are recorded as not third-party owned. Ownership types recorded: PPA 311, lease 65, prepaid lease 1, other 19.

Installers by installs in 95953

Installers with a page in this index, most installs in this ZIP first. 153 such installers have at least one install here. 16 more installs were by 16 installer names without a page in this index. 21 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95953Last 24 months
Citadel Roofing and Solar1501
Sunrun12837
Westhaven Inc10813
Tesla Energy Operations (formerly SolarCity)890
SunPower770
Vivint Solar Developer, LLC730
Infinity Energy, Inc621
V3 Electric400
FREEDOM FOREVER LLC346
Gold Rush Energy Solutions290

City and county recorded for 95953

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Live Oak1,326
County: Sutter County1,326

Common questions

How common are home batteries with solar in 95953?

13.8% of the residential solar installs here include battery storage across all years (183 of 1,326). In the last 24 months the share was 86.4% (102 of 118).

How many solar installs in 95953 are under NEM 3.0?

168 of the 1,326 installs here with a tariff recorded (12.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95953?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Citadel Roofing and Solar (150), Sunrun (128), Westhaven Inc (108). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.