Cobalt Power Systems, Inc.

How many solar installs has Cobalt Power Systems, Inc. done in California, and which license number is on its installs?

Cobalt Power Systems, Inc. has 2,876 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Nov 5, 2003 to Aug 28, 2026), most of them in Santa Clara County (1,828), San Mateo County (855) and Alameda County (83). CSLB lists license 820697 (COBALT POWER SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,876
Last 24 months
416
Total capacity
25,848.4 kW DC
Median system size
7.5 kW DC
With battery storage
28.7% all time; 88.2% last 24 months
Third-party owned
0.2% of 2,876 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
429 installs, latest Aug 28, 2026
Ownership types recorded
lease 7
Median battery size
14 kWh (266 installs list a capacity)
First install
Nov 5, 2003
Latest install
Aug 28, 2026
Counties
15
Utilities
PGE 2,876
CSLB license
820697

Is Cobalt Power Systems, Inc. still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (305 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200320
2004130
2005160
2006240
2007430
2008390
2009890
20101150
20111240
20121000
2013990
20141050
20151341
20161441
20171041
201813818
201915729
202019768
202122981
202221592
202325889
2024151108
2025141109
2026 (through Aug 31, 2026)239228

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

429 of its 2,876 interconnected installs (14.9% of the 2,876 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,08337.7%not counted
NEM 2.01,36447.4%416 (30.5%)
Net Billing Tariff42914.9%379 (88.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 7 of Cobalt Power Systems, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 7, prepaid lease 0, other 0. Across all installers, 7 residential systems list a third-party owner name that matches Cobalt Power Systems, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Cobalt Power Systems, Inc.7

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 394 of Cobalt Power Systems, Inc.’s 416 installs name a module maker in the “Generator Manufacturer” fields, and most of those (246, 62.4%) used modules recorded as SunPower.

In the last 24 months, 416 of Cobalt Power Systems, Inc.’s 416 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (335, 80.5%) used inverters recorded as Tesla.

In the last 24 months, 297 of Cobalt Power Systems, Inc.’s 416 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (263, 88.6%) used batteries recorded as Tesla.

655 of 825 battery-paired PG&E and SCE installs (79.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower2462,080
Qcells103129
REC25not in top list
Hyundai22not in top list
Kyocera4not in top list
Inverter makerTesla335802
Enphase177467
SunPower271,661
SMA13322
FranklinWH8not in top list
Battery makerTesla263623
Enphase2525
FranklinWH88
Lunar Energy11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,649 of 2,876 installs, inverters on 2,876. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Cobalt Power Systems, Inc. as developer on 486 battery storage projects and as installer on 484 (483 name it as both), 487 projects in all with 19,954 kWh of storage. 402 have the status Paid, with $3,935,323 in current incentive allocations. Applications were received from Feb 23, 2016 to Jan 28, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid40216,275$3,935,323
PBI in Process4370$101,848
Reserved467$40,326
Pending Reservation240$52,159
Cancelled733,163$792,105
RRF Rejected240$5,460

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage34716,728$3,812,136288$3,111,108
Small Residential Storage1212,584$599,386107$557,446
Equity Resiliency14555$451,7927$266,769
Residential Solar and Storage Equity - AB 209 Non-POU126$37,6390$0
Residential Solar and Storage Equity - Ratepayer113$14,5200$0
Not stated348$11,7480$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
820697COBALT POWER SYSTEMS INC (Corporation)CLEARC-46 Solar ContractorJun 12, 2003Jun 30, 20272,179

License numbers are the ones the utilities recorded on the interconnection applications (2,179 of 2,876 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 820697. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Cobalt Power Systems, Inc.’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
City and County of San Francisco82069717825

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara1,828
San Mateo855
Alameda83
Contra Costa37
Santa Cruz35
Monterey12
San Francisco11
Marin7
Solano2
Mendocino1
Napa1
San Joaquin1
Sonoma1
Tuolumne1
Yolo1

Top cities

CityInstalls
Los Altos510
San Jose286
Mountain View227
Los Altos Hills209
Menlo Park187
Sunnyvale171
Saratoga128
Portola Valley125
Atherton117
Los Gatos112
Redwood City85
Cupertino84
Woodside78
Hillsborough60
San Mateo60

Names as recorded by the utilities

The utilities recorded this installer under 15 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
COBALT POWER SYSTEMS INC1,357
Cobalt Power Systems, Inc.1,238
Cobalt Power Systems123
Cobalt Power Systems, Inc84
Cobalt Power Systems Inc41
Cobalt Power Systems Inc.21
COBALT POWER SYSTEMS, INC3
Cobalt Power Systems, inc.2
Cobalt Power Systems, inc1
CObalt Power Systems, Inc1
cobalt Power Systems, Inc.1
Cobalt power Systems, Inc.1
Cobalt Power systems, Inc.1
Cobalt Power Systems,Inc1
Cobalt Power Systems. Inc.1

Common questions

Where does Cobalt Power Systems, Inc. install solar?

Its installs are spread across 15 counties. The most are in Santa Clara County (1,828 installs), followed by San Mateo County (855).

How often does Cobalt Power Systems, Inc. install batteries with solar?

28.7% of its interconnected solar installs include battery storage across all years, and 88.2% in the last 24 months (367 of 416).

How many Cobalt Power Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

429 of its 2,876 interconnected installs (14.9% of the 2,876 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.