How many solar installs has ROCKIN ROOFERS done in California, and which license number is on its installs?

ROCKIN ROOFERS has 3,179 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 9, 2019 to Aug 31, 2026), most of them in Sonoma County (708), San Mateo County (611) and Santa Clara County (462). CSLB lists license 991938 (ROCKIN ROOFERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,179
Last 24 months
655
Total capacity
21,100.2 kW DC
Median system size
5.9 kW DC
With battery storage
34.5% all time; 83.5% last 24 months
Third-party owned
2.9% of 3,179 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
823 installs, latest Aug 31, 2026
Ownership types recorded
PPA 77, lease 3, other 11
Median battery size
19.2 kWh (811 installs list a capacity)
First install
Oct 9, 2019
Latest install
Aug 31, 2026
Counties
27
Utilities
PGE 3,176, SCE 3
CSLB license
991938

Is ROCKIN ROOFERS still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (325 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019656
202035059
2021476115
202260778
2023792122
2024336231
2025338293
2026 (through Aug 31, 2026)215192

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

823 of its 3,179 interconnected installs (25.9% of the 3,179 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0210.7%not counted
NEM 2.02,33573.5%383 (16.4%)
Net Billing Tariff82325.9%698 (84.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 91 of ROCKIN ROOFERS’s installs the utility recorded a third-party ownership type: PPA 77, lease 3, prepaid lease 0, other 11. No residential system in the file lists a third-party owner name that matches ROCKIN ROOFERS exactly.

Third-party owner named on its installsInstalls
HDM91

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 633 of ROCKIN ROOFERS’ 655 installs name a module maker in the “Generator Manufacturer” fields, and most of those (402, 63.5%) used modules recorded as Silfab.

In the last 24 months, 655 of ROCKIN ROOFERS’ 655 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (375, 57.3%) used inverters recorded as Tesla.

In the last 24 months, 463 of ROCKIN ROOFERS’ 655 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (292, 63.1%) used batteries recorded as Tesla.

971 of 1,096 battery-paired PG&E and SCE installs (88.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab4021,482
JA Solar123149
REC40244
Hyundai33not in top list
United Renewable Energy20642
Inverter makerTesla375411
SolarEdge1912,570
Enphase122248
FranklinWH113208
SMA822
Battery makerTesla292317
FranklinWH110201
Enphase3045
SolarEdge28104
LG3306

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,082 of 3,179 installs, inverters on 3,179. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ROCKIN ROOFERS as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 27 kWh of storage. 1 have the status Paid, with $2,040 in current incentive allocations. Applications were received from Apr 19, 2023 to Sep 7, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$2,040
Cancelled114$2,040

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage227$4,0801$2,040

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
991938ROCKIN ROOFERS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorApr 8, 2014Apr 30, 20283,178

License numbers are the ones the utilities recorded on the interconnection applications (3,178 of 3,179 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 991938. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ROCKIN ROOFERS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco991938111819293031183813207
unincorporated Marin County991938101717332000079

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma708
San Mateo611
Santa Clara462
Marin363
Alameda344
Contra Costa238
San Francisco198
Santa Cruz63
Napa50
Solano45
Lake20
Mendocino16
Fresno13
Yolo10
San Joaquin9
El Dorado5
San Benito5
Merced4
Nevada4
Amador2
Kings2
Tulare2
Kern1
Los Angeles1
Monterey1
Placer1
Tuolumne1

Top cities

CityInstalls
Santa Rosa250
San Jose210
San Francisco195
Petaluma159
San Carlos136
Oakland129
Los Gatos100
San Rafael100
Windsor93
Redwood City91
San Mateo89
Novato86
Belmont72
Berkeley67
Sonoma65

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ROCKIN ROOFERS3,178
Rockin Roofers1

Common questions

Where does ROCKIN ROOFERS install solar?

Its installs are spread across 27 counties. The most are in Sonoma County (708 installs), followed by San Mateo County (611).

How often does ROCKIN ROOFERS install batteries with solar?

34.5% of its interconnected solar installs include battery storage across all years, and 83.5% in the last 24 months (547 of 655).

How many ROCKIN ROOFERS installs are under NEM 3.0 (the Net Billing Tariff)?

823 of its 3,179 interconnected installs (25.9% of the 3,179 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.