ES SOLAR LLC

How many solar installs has ES SOLAR LLC done in California, and which license number is on its installs?

ES SOLAR LLC has 85 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 31, 2024 to Aug 24, 2026), most of them in Santa Cruz County (30), Santa Clara County (14) and Alameda County (8). CSLB lists license 1127444 (ES SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
85
Last 24 months
85
Total capacity
565.3 kW DC
Median system size
6.8 kW DC
With battery storage
97.6% all time; 97.6% last 24 months
Third-party owned
3.5% of 85 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
76 installs, latest Aug 24, 2026
Ownership types recorded
PPA 3
Median battery size
20 kWh (51 installs list a capacity)
First install
Oct 31, 2024
Latest install
Aug 24, 2026
Counties
14
Utilities
PGE 85
CSLB license
1127444

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202433
20254039
2026 (through Aug 31, 2026)4241

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

76 of its 85 interconnected installs (89.4% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.022.4%not counted
NEM 2.078.2%7 (100.0%)
Net Billing Tariff7689.4%74 (97.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of ES SOLAR LLC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ES SOLAR LLC exactly.

Third-party owner named on its installsInstalls
Lightreach2
Solrite1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 83 of ES SOLAR LLC’s 85 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (33, 39.8%) used modules recorded as Mission Solar.

In the last 24 months, 85 of ES SOLAR LLC’s 85 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (57, 67.1%) used inverters recorded as Tesla.

In the last 24 months, 61 of ES SOLAR LLC’s 85 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (35, 57.4%) used batteries recorded as Tesla.

61 of 83 battery-paired PG&E and SCE installs (73.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar3333
SEG Solar2121
JA Solar1515
REC88
Qcells66
Inverter makerTesla5757
SolarEdge2525
sonnen1515
Enphase1414
Lunar Energy99
Battery makerTesla3535
sonnen1414
Lunar Energy1111
Enphase11
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 83 of 85 installs, inverters on 85. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ES SOLAR LLC as developer on 973 battery storage projects and as installer on 979 (970 name it as both), 982 projects in all with 20,334 kWh of storage. 364 have the status Paid, with $2,813,933 in current incentive allocations. Applications were received from Sep 18, 2020 to Nov 16, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3649,238$2,813,933
PBI in Process2198$190,940
Reserved4608,159$10,548,452
Pending Reservation33475$929,140
Waitlist41660$1,091,656
Cancelled811,578$1,628,395
RRF Rejected126$3,960

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 POU5018,798$12,597,02157$1,049,021
Small Residential Storage3238,389$765,780239$549,909
Residential Solar and Storage Equity - AB 209 Non-POU821,181$2,404,3249$215,733
Residential Solar and Storage Equity - Ratepayer461,100$776,81541$688,525
Equity Resiliency17536$478,03610$199,056
Residential Storage Equity12304$180,5408$111,690
Not stated126$3,9600$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1127444ES SOLAR LLC (Limited Liability)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorOct 7, 2024Oct 31, 202885

License numbers are the ones the utilities recorded on the interconnection applications (85 of 85 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1127444. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Cruz30
Santa Clara14
Alameda8
Solano6
El Dorado5
San Joaquin5
Contra Costa4
Amador3
Nevada3
Placer2
Yolo2
Glenn1
Monterey1
Sonoma1

Top cities

CityInstalls
San Jose8
Santa Cruz8
Scotts Valley8
Aptos7
El Dorado Hills3
Ione3
Berkeley2
Brentwood2
Grass Valley2
Manteca2
Oakland2
Saratoga2
Vacaville2
Vallejo2
Watsonville2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ES SOLAR LLC84
Es Solar LLC1

Common questions

Where does ES SOLAR LLC install solar?

Its installs are spread across 14 counties. The most are in Santa Cruz County (30 installs), followed by Santa Clara County (14).

How often does ES SOLAR LLC install batteries with solar?

97.6% of its interconnected solar installs include battery storage across all years, and 97.6% in the last 24 months (83 of 85).

How many ES SOLAR LLC installs are under NEM 3.0 (the Net Billing Tariff)?

76 of its 85 interconnected installs (89.4% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.