Home solar in ZIP code 95341, California
Service city recorded on most installs: Merced. County: Merced County.
How many homes in ZIP code 95341 have solar?
PG&E, SCE and SDG&E interconnected 989 residential solar systems in ZIP code 95341 through Aug 31, 2026, 191 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Merced, Merced County, as the service city on 989 of them. Sunrun has the most installs recorded in this ZIP, 214.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 989
- Last 24 months
- 191 (Sep 2024 through Aug 2026)
- Capacity
- 7,558.3 kW DC
- Median system size
- 6.2 kW DC
- Net Billing Tariff (NEM 3.0)
- 277 installs, 28.0% of those with a tariff recorded
- Utility
- PGE 989
- First install in data
- Mar 25, 2010
- Latest install in data
- Aug 27, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2010 | 2 | 0 |
| 2011 | 3 | 0 |
| 2012 | 6 | 0 |
| 2013 | 7 | 0 |
| 2014 | 21 | 0 |
| 2015 | 84 | 0 |
| 2016 | 89 | 0 |
| 2017 | 68 | 0 |
| 2018 | 48 | 0 |
| 2019 | 50 | 1 |
| 2020 | 44 | 0 |
| 2021 | 53 | 1 |
| 2022 | 114 | 6 |
| 2023 | 132 | 16 |
| 2024 | 112 | 85 |
| 2025 | 99 | 87 |
| 2026 (through Aug 31, 2026) | 57 | 50 |
Battery storage
24.9% of the residential solar installs here include battery storage across all years (246 of 989). In the last 24 months the share was 87.4% (167 of 191).
Net metering tariff
Of the 989 installs with a net metering tariff recorded: NEM 1.0 219 (22.1%), NEM 2.0 493 (49.8%), the Net Billing Tariff (often called NEM 3.0) 277 (28.0%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
45.5% of the 989 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 539 are recorded as not third-party owned. Ownership types recorded: PPA 361, lease 74, prepaid lease 3, other 12.
Installers by installs in 95341
Installers with a page in this index, most installs in this ZIP first. 131 such installers have at least one install here. 19 more installs were by 18 installer names without a page in this index. 10 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 95341 | Last 24 months |
|---|---|---|
| Sunrun | 214 | 85 |
| Tesla Energy Operations (formerly SolarCity) | 121 | 6 |
| Empower Electric Solar | 41 | 18 |
| FREEDOM FOREVER LLC | 40 | 3 |
| SOLGEN ELECTRIC | 29 | 0 |
| BRIGHT OPS | 27 | 19 |
| Merced County Community Action Agency | 25 | 0 |
| Vivint Solar Developer, LLC | 24 | 0 |
| Merced County Community Action | 23 | 0 |
| Bright Planet Solar | 22 | 0 |
City and county recorded for 95341
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Merced | 989 |
| County: Merced County | 989 |
Common questions
How common are home batteries with solar in 95341?
24.9% of the residential solar installs here include battery storage across all years (246 of 989). In the last 24 months the share was 87.4% (167 of 191).
How many solar installs in 95341 are under NEM 3.0?
277 of the 989 installs here with a tariff recorded (28.0%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 95341?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (214), Tesla Energy Operations (formerly SolarCity) (121), Empower Electric Solar (41). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.