R. T. Maher Construction

How many solar installs has R. T. Maher Construction done in California, and which license number is on its installs?

R. T. Maher Construction has 299 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Jul 5, 2006 to Aug 19, 2026), most of them in Merced County (226), Stanislaus County (21) and Mariposa County (19). CSLB lists license 503251 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
299
Last 24 months
13
Total capacity
3,788 kW DC
Median system size
9.5 kW DC
With battery storage
3.3% all time; 76.9% last 24 months
Third-party owned
0.3% of 299 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Aug 19, 2026
Ownership types recorded
prepaid lease 1
Median battery size
1 kWh (7 installs list a capacity)
First install
Jul 5, 2006
Latest install
Aug 19, 2026
Counties
17
Utilities
PGE 299
CSLB license
503251

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200630
200720
200800
200920
201040
201160
201250
201320
201400
201500
201670
2017260
2018230
2019330
2020300
2021360
2022430
2023410
2024240
202597
2026 (through Aug 31, 2026)33

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 299 interconnected installs (4.0% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03210.7%not counted
NEM 2.025585.3%0 (0.0%)
Net Billing Tariff124.0%10 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of R. T. Maher Construction’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches R. T. Maher Construction exactly.

Third-party owner named on its installsInstalls
Ronald Holcombe1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of R. T. Maher Construction’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (12, 100.0%) used modules recorded as REC.

In the last 24 months, 13 of R. T. Maher Construction’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 53.8%) used inverters recorded as Tesla.

In the last 24 months, 9 of R. T. Maher Construction’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used batteries recorded as Tesla.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC12244
Inverter makerTesla77
Shenzhen Eternalplanet Energy Pingshan Ltd.3not in top list
SolarEdge2138
Fronius175
SMA178
Battery makerTesla66
Shenzhen Eternalplanet Energy Pingshan Ltd.33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 276 of 299 installs, inverters on 299. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
503251Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorDec 24, 1986Nov 30, 2027274

License numbers are the ones the utilities recorded on the interconnection applications (274 of 299 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 503251. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced226
Stanislaus21
Mariposa19
San Joaquin10
Madera6
Fresno4
Butte2
Sutter2
Calaveras1
Contra Costa1
Monterey1
San Benito1
San Mateo1
Santa Clara1
Sonoma1
Tulare1
Tuolumne1

Top cities

CityInstalls
Merced163
Atwater48
Mariposa10
Newman9
Catheys Valley7
Tracy6
Gustine5
Madera5
Winton4
Fresno3
Oakdale3
Riverbank3
Crows Landing2
Dos Palos2
El Nido2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
R T MAHER CONSTRUCTION192
R. T. Maher Construction83
R T Maher Construction23
R. T Maher Construction1

Common questions

Where does R. T. Maher Construction install solar?

Its installs are spread across 17 counties. The most are in Merced County (226 installs), followed by Stanislaus County (21).

How often does R. T. Maher Construction install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 76.9% in the last 24 months (10 of 13).

How many R. T. Maher Construction installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 299 interconnected installs (4.0% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.