SAVECO ELECTRIC

How many solar installs has SAVECO ELECTRIC done in California, and which license number is on its installs?

SAVECO ELECTRIC has 73 residential solar installs interconnected in California, active in the records from 2020 through 2023 (Nov 6, 2020 to Jul 5, 2023), most of them in Riverside County (17), Los Angeles County (14) and San Joaquin County (5). The license number recorded on most of its installs, 1052375, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
73
Last 24 months
0
Total capacity
642 kW DC
Median system size
7 kW DC
With battery storage
5.5% all time; no installs in the last 24 months last 24 months
Third-party owned
6.8% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 5
Median battery size
10.1 kWh (3 installs list a capacity)
First install
Nov 6, 2020
Latest install
Jul 5, 2023
Counties
21
Utilities
SCE 44, PGE 29
CSLB license
1052375

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
2021150
2022553
202321
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 73 interconnected installs with a tariff recorded (73) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.073100.0%4 (5.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of SAVECO ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 0, lease 5, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SAVECO ELECTRIC exactly.

Third-party owner named on its installsInstalls
Bright Oak4
BrightOak1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 62 of SAVECO ELECTRIC’s 73 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (29, 46.8%) used modules recorded as Aptos Solar.

Across all years, 73 of SAVECO ELECTRIC’s 73 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (32, 43.8%) used inverters recorded as SolarEdge.

Across all years, 3 of SAVECO ELECTRIC’s 73 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

3 of 4 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar029
Axitec022
Mission Solar03
Solaria03
Canadian Solar02
Inverter makerSolarEdge032
Enphase029
SunPower08
Tesla03
ABB01
Battery makerEnphase03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 73 installs, inverters on 73. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1052375Not found in the CSLB License Master file pulled Nov 4, 202673

License numbers are the ones the utilities recorded on the interconnection applications (73 of 73 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SAVECO ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021Total
unincorporated San Diego County1052375314

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside17
Los Angeles14
San Joaquin5
Orange4
Ventura4
Alameda3
Contra Costa3
San Bernardino3
Kern2
Lake2
Mendocino2
Merced2
Napa2
Santa Clara2
Sonoma2
Fresno1
Humboldt1
Monterey1
San Mateo1
Tuolumne1
Yuba1

Top cities

CityInstalls
Palm Desert4
Moreno Valley3
Beaumont2
Blythe2
Kelseyville2
Lancaster2
Long Beach2
Los Banos2
Oakland2
Palmdale2
Stockton2
Agoura Hills1
Altadena1
Apple Valley1
Boron1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SAVECO ELECTRIC73

Common questions

Where does SAVECO ELECTRIC install solar?

Its installs are spread across 21 counties. The most are in Riverside County (17 installs), followed by Los Angeles County (14).

How often does SAVECO ELECTRIC install batteries with solar?

5.5% of its interconnected solar installs include battery storage across all years.

How many SAVECO ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 73 interconnected installs with a tariff recorded (73) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.