Peak Power Solutions

How many solar installs has Peak Power Solutions done in California, and which license number is on its installs?

Peak Power Solutions has 1,530 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jun 30, 2010 to Aug 31, 2026), most of them in Orange County (691), Riverside County (303) and San Diego County (254). CSLB lists license 973253 (PEAK POWER SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Peak Power Solutions here carry more than one CSLB license number: 973253 on 1,107 (CSLB holder PEAK POWER SOLUTIONS INC, Tustin) and 826780 on 81 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
1,530
Last 24 months
84
Total capacity
10,894.3 kW DC
Median system size
6.4 kW DC
With battery storage
9.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 84.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
19.0% of 1,313 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
106 installs, latest Aug 31, 2026
Ownership types recorded
PPA 119, lease 120, prepaid lease 11
Median battery size
10.1 kWh (111 installs list a capacity)
First install
Jun 30, 2010
Latest install
Aug 31, 2026
Counties
23
Utilities
SCE 1,088, SDGE 396, PGE 46
CSLB license
973253, 826780

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201120
201230
2013500
20141330
20151660
20161560
20171530
20181562
20191491
2020774
2021973
20221267
202313211
20245626
20253827
2026 (through Aug 31, 2026)3530

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

106 of its 1,530 interconnected installs (6.9% of the 1,530 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.056837.1%not counted
NEM 2.085655.9%27 (4.0%)
Net Billing Tariff1066.9%84 (86.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 250 of Peak Power Solutions’s installs the utility recorded a third-party ownership type: PPA 119, lease 120, prepaid lease 11, other 0. Across all installers, 41 residential systems list a third-party owner name that matches Peak Power Solutions exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova110
Spruce85
Peak Power Solutions41
SolSource DevCo LLC10
Sunnova Energy2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 84 of Peak Power Solutions’ 84 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (34, 40.5%) used modules recorded as Qcells.

In the last 24 months, 84 of Peak Power Solutions’ 84 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (74, 88.1%) used inverters recorded as Enphase.

In the last 24 months, 65 of Peak Power Solutions’ 84 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (57, 87.7%) used batteries recorded as Enphase.

106 of 111 battery-paired PG&E and SCE installs (95.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells34477
Hyundai29not in top list
REC7not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.3not in top list
Silfab3not in top list
Inverter makerEnphase741,113
Tesla623
SMA2not in top list
EG41not in top list
SolarEdge1202
Battery makerEnphase5786
Tesla55
FranklinWH22
Telsa1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,421 of 1,530 installs, inverters on 1,529. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Peak Power Solutions as developer on 2 battery storage projects and as installer on 3 (2 name it as both), 3 projects in all with 37 kWh of storage. 1 have the status Paid, with $2,518 in current incentive allocations. Applications were received from Dec 6, 2018 to Jan 7, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$2,518
Reserved110$22,566
Waitlist119$36,793

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU228$59,3590$0
Small Residential Storage18$2,5181$2,518

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
973253PEAK POWER SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-17May 24, 2012May 31, 20281,107
826780Not found in the CSLB License Master file pulled Nov 4, 202681

License numbers are the ones the utilities recorded on the interconnection applications (1,190 of 1,530 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 973253. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Peak Power Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202220232025Total
unincorporated San Diego County9732531311118

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Orange691
Riverside303
San Diego254
Los Angeles124
San Bernardino107
Contra Costa10
Solano7
Alameda5
San Joaquin5
Kern4
Ventura3
El Dorado2
Napa2
Stanislaus2
Tulare2
Yolo2
Madera1
Marin1
Mariposa1
Placer1
San Luis Obispo1
Sutter1
Tuolumne1

Top cities

CityInstalls
Santa Ana110
Sun City73
Tustin66
San Clemente48
Corona46
San Diego45
Orange43
Huntington Beach39
San Marcos39
Yorba Linda39
Mission Viejo28
Coto de Caza24
Fullerton24
Placentia24
Irvine23

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PEAK POWER SOLUTIONS INC668
Peak Power Solutions409
Peak Power Solutions, Inc.249
Peak Power Solutions, Inc121
PEAK POWER SOLUTIONS81
PEAK POWER SOLUTIONS, INC.2

Common questions

Where does Peak Power Solutions install solar?

Its installs are spread across 23 counties. The most are in Orange County (691 installs), followed by Riverside County (303).

How often does Peak Power Solutions install batteries with solar?

9.8% of its interconnected solar installs include battery storage across all years, and 84.6% in the last 24 months (66 of 78). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Peak Power Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

106 of its 1,530 interconnected installs (6.9% of the 1,530 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.