GSP ELECTRIC LLC

How many solar installs has GSP ELECTRIC LLC done in California, and which license number is on its installs?

GSP ELECTRIC LLC has 66 residential solar installs interconnected in California, active in the records from 2021 through 2024 (May 17, 2021 to Mar 25, 2024), most of them in Riverside County (9), San Joaquin County (7) and Contra Costa County (6). The license number recorded on most of its installs, 1069269, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
0
Total capacity
564.5 kW DC
Median system size
7.8 kW DC
With battery storage
25.8% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Mar 25, 2024
Ownership types recorded
none recorded
Median battery size
27 kWh (6 installs list a capacity)
First install
May 17, 2021
Latest install
Mar 25, 2024
Counties
28
Utilities
PGE 45, SCE 21
CSLB license
1069269

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021160
2022318
2023179
202420
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 25, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.5%not counted
NEM 2.06497.0%16 (25.0%)
Net Billing Tariff11.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GSP ELECTRIC LLC’s installs. No residential system in the file lists a third-party owner name that matches GSP ELECTRIC LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 61 of GSP ELECTRIC LLC’s 66 installs name a module maker in the “Generator Manufacturer” fields, and most of those (47, 77.0%) used modules recorded as Qcells.

Across all years, 66 of GSP ELECTRIC LLC’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (54, 81.8%) used inverters recorded as Enphase.

Across all years, 14 of GSP ELECTRIC LLC’s 66 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (14, 100.0%) used batteries recorded as Tesla.

14 of 17 battery-paired PG&E and SCE installs (82.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells047
Tesla06
Canadian Solar05
Sunpal Power Co. Ltd.02
JinkoSolar01
Inverter makerEnphase054
Tesla013
SolarEdge06
SunPower04
Fronius01
Battery makerTesla014

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 66 installs, inverters on 66. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GSP ELECTRIC LLC as developer on 6 battery storage projects and as installer on 5 (5 name it as both), 6 projects in all with 172 kWh of storage. 6 have the status Paid, with $70,140 in current incentive allocations. Applications were received from Jun 24, 2020 to Apr 9, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6172$70,140

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage5119$17,3405$17,340
Equity Resiliency153$52,8001$52,800

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1069269Not found in the CSLB License Master file pulled Nov 4, 202666

License numbers are the ones the utilities recorded on the interconnection applications (66 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list GSP ELECTRIC LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco106926922

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside9
San Joaquin7
Contra Costa6
Los Angeles5
San Mateo4
Santa Clara4
Kern3
Solano3
El Dorado2
Fresno2
Madera2
San Bernardino2
Ventura2
Butte1
Calaveras1
Marin1
Mariposa1
Mendocino1
Merced1
Monterey1
Nevada1
Orange1
Placer1
San Benito1
San Francisco1
Santa Barbara1
Santa Cruz1
Yuba1

Top cities

CityInstalls
Manteca4
Hemet3
San Jose3
Lakewood2
Vacaville2
Antioch1
Auburn1
Bay Point1
Brentwood1
Camino1
Chino1
Chowchilla1
Colton1
Concord1
Cool1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GSP ELECTRIC LLC66

Common questions

Where does GSP ELECTRIC LLC install solar?

Its installs are spread across 28 counties. The most are in Riverside County (9 installs), followed by San Joaquin County (7).

How often does GSP ELECTRIC LLC install batteries with solar?

25.8% of its interconnected solar installs include battery storage across all years.

How many GSP ELECTRIC LLC installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.