Enable Energy

How many solar installs has Enable Energy done in California, and which license number is on its installs?

Enable Energy has 92 residential solar installs interconnected in California, active in the records from 2016 through 2023 (Jul 21, 2016 to Jan 31, 2023), most of them in Alameda County (16), Placer County (16) and Fresno County (9). CSLB lists license 990593 (ENABLE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-13, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
92
Last 24 months
0
Total capacity
1,382 kW DC
Median system size
9.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
34.8% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 29, prepaid lease 2, other 1
First install
Jul 21, 2016
Latest install
Jan 31, 2023
Counties
29
Utilities
PGE 89, SCE 3
CSLB license
990593

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201660
2017480
2018140
2019140
202050
202140
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 92 interconnected installs with a tariff recorded (92) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.088.7%not counted
NEM 2.08491.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 32 of Enable Energy’s installs the utility recorded a third-party ownership type: PPA 29, lease 0, prepaid lease 2, other 1. Across all installers, 8 residential systems list a third-party owner name that matches Enable Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun25
Enable Energy7

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 92 of Enable Energy’s 92 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (39, 42.4%) used modules recorded as Trina Solar.

Across all years, 92 of Enable Energy’s 92 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (54, 58.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar039
JA Solar026
Qcells017
Hyundai09
LG01
Inverter makerEnphase054
Fronius020
SolarEdge016
SMA03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 92 of 92 installs, inverters on 92. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Enable Energy as developer on 23 battery storage projects and as installer on 20 (20 name it as both), 23 projects in all with 18,043 kWh of storage. 8 have the status Paid, with $1,279,750 in current incentive allocations. Applications were received from Jan 30, 2019 to Sep 29, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid83,660$1,279,750
PBI in Process108,413$1,736,063
Cancelled55,969$1,548,125

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage1416,036$3,564,9383$724,750
Non-Residential Storage Equity92,007$999,0005$555,000

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990593ENABLE ENERGY (Corporation)CLEARB General Building Contractor; C-13; C-46 Solar ContractorFeb 13, 2014Feb 29, 202889

License numbers are the ones the utilities recorded on the interconnection applications (89 of 92 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990593. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda16
Placer16
Fresno9
Lake4
Santa Clara4
Calaveras3
El Dorado3
Solano3
Stanislaus3
Butte2
Contra Costa2
Glenn2
Los Angeles2
Mendocino2
Merced2
Nevada2
San Joaquin2
San Luis Obispo2
Yolo2
Yuba2
Amador1
Madera1
Mariposa1
Monterey1
Napa1
Plumas1
San Benito1
San Bernardino1
Tuolumne1

Top cities

CityInstalls
Hayward14
Fresno9
Auburn3
Clearlake3
Lincoln3
Rocklin3
San Jose3
Berkeley2
Cameron Park2
Granite Bay2
Grass Valley2
Oakdale2
Palmdale2
San Andreas2
Suisun City2

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Enable Energy61
Enable Energy Inc18
ENABLE ENERGY INC5
Enable Energy, Inc3
Enable Energy, Inc.3
ENABLE ENERGY1
Enable Energy Inc.1

Common questions

Where does Enable Energy install solar?

Its installs are spread across 29 counties. The most are in Alameda County (16 installs), followed by Placer County (16).

How often does Enable Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Enable Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 92 interconnected installs with a tariff recorded (92) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.