How many solar installs has Divine Power USA done in California, and which license number is on its installs?

Divine Power USA has 2,058 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Aug 17, 2010 to Apr 13, 2026), most of them in Kern County (1,639), Tulare County (136) and Riverside County (71). CSLB lists license 958055 (DIVINE POWER USA) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,058
Last 24 months
91
Total capacity
15,004 kW DC
Median system size
6.6 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 4.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
20.7% of 2,051 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
41 installs, latest Mar 4, 2026
Ownership types recorded
PPA 397, lease 4, other 24
Median battery size
19.9 kWh (3 installs list a capacity)
First install
Aug 17, 2010
Latest install
Apr 13, 2026
Counties
28
Utilities
PGE 1,673, SCE 338, SDGE 47
CSLB license
958055

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201150
2012110
2013140
2014610
20151480
20161520
20171080
2018800
2019410
2020450
20212660
20224410
20234321
20241692
2025783
2026 (through Aug 31, 2026)61

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

41 of its 2,058 interconnected installs (2.0% of the 2,058 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.6% of those include battery storage. The latest Net Billing Tariff install was approved Mar 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.039719.3%not counted
NEM 2.01,62078.7%1 (0.1%)
Net Billing Tariff412.0%6 (14.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 425 of Divine Power USA’s installs the utility recorded a third-party ownership type: PPA 397, lease 4, prepaid lease 0, other 24. Across all installers, 11 residential systems list a third-party owner name that matches Divine Power USA exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solkraft182
Valley85
North Shore65
Solkraft Premier24
Loanpal18

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 70 of Divine Power USA’s 91 installs name a module maker in the “Generator Manufacturer” fields, and most of those (56, 80.0%) used modules recorded as Canadian Solar.

In the last 24 months, 91 of Divine Power USA’s 91 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (88, 96.7%) used inverters recorded as Enphase.

In the last 24 months, 4 of Divine Power USA’s 91 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used batteries recorded as Enphase.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar56283
Axitec8277
Solaria3not in top list
Qcells2141
Silfab1not in top list
Inverter makerEnphase881,605
Foxess1not in top list
Shenzhen Megarevo Technology Co., Ltd.1not in top list
Xantrex Technology Inc.1not in top list
Battery makerEnphase25
Enpahse11
Fox ESS11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,907 of 2,058 installs, inverters on 2,058. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
958055DIVINE POWER USA (Corporation)CLEAR, Pending Case/CITC-10 Electrical Contractor; C-46 Solar ContractorFeb 23, 2011Jan 31, 20271,996

License numbers are the ones the utilities recorded on the interconnection applications (1,997 of 2,058 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 958055. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Divine Power USA’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023Total
City and County of San Francisco9580550011
unincorporated San Diego County9580551315

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Kern1,639
Tulare136
Riverside71
San Diego46
San Bernardino40
Fresno37
Los Angeles31
Merced7
Ventura7
Orange6
El Dorado4
Kings4
Santa Clara4
Alameda3
Madera3
San Luis Obispo3
Santa Barbara3
Contra Costa2
Mendocino2
San Mateo2
Amador1
Butte1
Lake1
Monterey1
Placer1
San Francisco1
San Joaquin1
Tehama1

Top cities

CityInstalls
Bakersfield1,297
Porterville113
Wasco102
Mc Farland93
Shafter43
Arvin32
Fresno25
Delano12
Taft12
Tehachapi11
Corona10
Ridgecrest10
Fontana9
Temecula9
Visalia9

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DIVINE POWER USA1,394
Divine Power USA636
Divine Power USA.24
Divine Power USa2
Divine Power Usa1
Divine Power, USA1

Common questions

Where does Divine Power USA install solar?

Its installs are spread across 28 counties. The most are in Kern County (1,639 installs), followed by Tulare County (136).

How often does Divine Power USA install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years, and 4.4% in the last 24 months (4 of 91). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Divine Power USA installs are under NEM 3.0 (the Net Billing Tariff)?

41 of its 2,058 interconnected installs (2.0% of the 2,058 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 14.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.