Arise Solar

How many solar installs has Arise Solar done in California, and which license number is on its installs?

Arise Solar has 1,321 residential solar installs interconnected in California, active in the records from 2008 through 2019 (Jan 31, 2008 to Dec 23, 2019), most of them in Fresno County (1,114), Madera County (69) and Kings County (46). The license number recorded on most of its installs, 847194, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,321
Last 24 months
0
Total capacity
11,859.3 kW DC
Median system size
8.4 kW DC
With battery storage
0.1% all time; no installs in the last 24 months last 24 months
Third-party owned
28.8% of 1,307 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 377
Median battery size
16 kWh (1 installs list a capacity)
First install
Jan 31, 2008
Latest install
Dec 23, 2019
Counties
10
Utilities
PGE 1,266, SCE 55
CSLB license
847194, 847914

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200840
200930
201010
201140
2012120
2013290
20141420
20152760
20162560
20173000
20182190
2019751
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 1,321 interconnected installs with a tariff recorded (1,321) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.074056.0%not counted
NEM 2.058144.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 377 of Arise Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 377, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Arise Solar exactly.

Third-party owner named on its installsInstalls
SunPower279
SunPower Capital LLC88
SunPower Captial LLC4
SunPower Capital LLC / Arise Solar2
SunPower Solar Program 1, LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1,253 of Arise Solar’s 1,321 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1,049, 83.7%) used modules recorded as SunPower.

Across all years, 1,321 of Arise Solar’s 1,321 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (727, 55.0%) used inverters recorded as SunPower.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower01,049
Canadian Solar055
SolarWorld054
REC031
Phono Solar Technology015
Inverter makerSunPower0727
SMA0249
SolarEdge0212
Fronius0110
Enphase036

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,253 of 1,321 installs, inverters on 1,321. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Arise Solar as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 26 kWh of storage. 1 have the status Paid, with $4,478 in current incentive allocations. Applications were received from Feb 23, 2016 to Jun 8, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$4,478
Cancelled213$9,681

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage114$4,4781$4,478
Not stated213$9,6810$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
847194Not found in the CSLB License Master file pulled Nov 4, 20261,166
847914Not found in the CSLB License Master file pulled Nov 4, 202678

License numbers are the ones the utilities recorded on the interconnection applications (1,246 of 1,321 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Fresno1,114
Madera69
Kings46
Tulare44
Merced31
Santa Barbara7
San Joaquin5
Kern3
Glenn1
Los Angeles1

Top cities

CityInstalls
Fresno563
Clovis395
Sanger46
Madera41
Hanford25
Reedley25
Kingsburg21
Visalia21
Lemoore20
Kerman13
Fowler12
Los Banos11
Coarsegold10
Dinuba9
Oakhurst7

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Arise Solar1,267
ARISE SOLAR49
Arise Solar Inc4
ARISE SOLAR INC1

Common questions

Where does Arise Solar install solar?

Its installs are spread across 10 counties. The most are in Fresno County (1,114 installs), followed by Madera County (69).

How often does Arise Solar install batteries with solar?

0.1% of its interconnected solar installs include battery storage across all years.

How many Arise Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 1,321 interconnected installs with a tariff recorded (1,321) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.