Sunsystem Technology

How many solar installs has Sunsystem Technology done in California, and which license number is on its installs?

Sunsystem Technology has 206 residential solar installs interconnected in California, active in the records from 2013 through 2025 (Apr 2, 2013 to Dec 17, 2025), most of them in Los Angeles County (59), Orange County (38) and Ventura County (21). CSLB lists license 1009107 (SUNSYSTEM TECHNOLOGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Sunsystem Technology here carry more than one CSLB license number: 1009107 on 160 (CSLB holder SUNSYSTEM TECHNOLOGY, San Diego) and 647337 on 36 (CSLB holder KITCHEN ART INC, Fair Oaks), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
206
Last 24 months
1
Total capacity
1,320.4 kW DC
Median system size
5.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
62.1% of 206 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Mar 11, 2024
Ownership types recorded
PPA 126, lease 2
First install
Apr 2, 2013
Latest install
Dec 17, 2025
Counties
27
Utilities
SCE 142, PGE 64
CSLB license
1009107, 647337

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201470
2015180
2016290
20171280
201800
201910
202080
202110
202220
202380
202420
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 206 interconnected installs (1.5% of the 206 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 11, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014268.9%not counted
NEM 2.06129.6%0 (0.0%)
Net Billing Tariff31.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 128 of Sunsystem Technology’s installs the utility recorded a third-party ownership type: PPA 126, lease 2, prepaid lease 0, other 0. Across all installers, 5 residential systems list a third-party owner name that matches Sunsystem Technology exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Spruce79
Greenspire17
Momentum Solar17
Momentum6
American Energy3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Sunsystem Technology’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Aptos Solar.

In the last 24 months, 1 of Sunsystem Technology’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1not in top list
Inverter makerEnphase1108

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 204 of 206 installs, inverters on 206. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunsystem Technology as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 59 kWh of storage. 1 have the status Paid, with $23,742 in current incentive allocations. Applications were received from Jun 5, 2017 to Jun 5, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid159$23,742

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage159$23,7421$23,742

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009107SUNSYSTEM TECHNOLOGY (Limited Liability)CLEAR, BOND Pay PendingC-10 Electrical ContractorNov 19, 2015Nov 30, 2027160
647337KITCHEN ART INC (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-33Jun 10, 1992Jun 30, 202836

License numbers are the ones the utilities recorded on the interconnection applications (200 of 206 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1009107, 647337. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Sunsystem Technology’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820232024Total
City and County of San Francisco10091070101
unincorporated San Diego County10091071113

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles59
Orange38
Ventura21
Placer17
Riverside16
El Dorado10
Yolo7
San Bernardino5
San Joaquin5
Solano5
Fresno4
Kern3
Amador2
Alameda1
Butte1
Contra Costa1
Kings1
Lake1
Napa1
Nevada1
San Mateo1
Santa Clara1
Santa Cruz1
Shasta1
Sonoma1
Tehama1
Tulare1

Top cities

CityInstalls
Simi Valley13
Cypress8
Lincoln7
Fullerton5
Gardena5
Oak Park5
West Sacramento5
Cerritos4
El Dorado Hills4
La Mirada4
Orange4
Perris4
Whittier4
Arcadia3
La Puente3

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunsystem Technology92
SunSystem Technology89
SUNSYSTEM TECHNOLOGY24
SunSystem technology1

Common questions

Where does Sunsystem Technology install solar?

Its installs are spread across 27 counties. The most are in Los Angeles County (59 installs), followed by Orange County (38).

How often does Sunsystem Technology install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Sunsystem Technology installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 206 interconnected installs (1.5% of the 206 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.