Sunergy Solar Inc.

How many solar installs has Sunergy Solar Inc. done in California, and which license number is on its installs?

Sunergy Solar Inc. has 161 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jun 25, 2015 to Aug 19, 2026), most of them in Los Angeles County (34), Tulare County (28) and Orange County (15). The license number recorded on most of its installs, 997610, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1135059 (ZEO ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Mar 31, 2027, recorded on 57 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Sunergy Solar Inc. here carry more than one CSLB license number: 997610 on 99 (not found in the CSLB License Master file) and 1135059 on 57 (CSLB holder ZEO ENERGY, Provo), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
161
Last 24 months
57
Total capacity
1,084.8 kW DC
Median system size
6.3 kW DC
With battery storage
33.5% all time; 94.7% last 24 months
Third-party owned
34.8% of 161 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
57 installs, latest Aug 19, 2026
Ownership types recorded
PPA 43, lease 13
Median battery size
5 kWh (40 installs list a capacity)
First install
Jun 25, 2015
Latest install
Aug 19, 2026
Counties
26
Utilities
SCE 106, PGE 55
CSLB license
997610, 1135059

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015170
2016700
2017170
201800
201900
202000
202100
202200
202300
202400
20251714
2026 (through Aug 31, 2026)4040

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

57 of its 161 interconnected installs (35.4% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09257.1%not counted
NEM 2.0127.5%0 (0.0%)
Net Billing Tariff5735.4%54 (94.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 56 of Sunergy Solar Inc.’s installs the utility recorded a third-party ownership type: PPA 43, lease 13, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunergy Solar Inc. exactly.

Third-party owner named on its installsInstalls
Light Reach Palmetto13
LightReach12
Palmetto6
Sunnova Lease5
sunedison3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 57 of Sunergy Solar Inc.’s 57 installs name a module maker in the “Generator Manufacturer” fields, and most of those (39, 68.4%) used modules recorded as JinkoSolar.

In the last 24 months, 57 of Sunergy Solar Inc.’s 57 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (52, 91.2%) used inverters recorded as Enphase.

In the last 24 months, 54 of Sunergy Solar Inc.’s 57 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (48, 88.9%) used batteries recorded as Enphase.

54 of 54 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar3939
Qcells1718
LG56
JA Solar1not in top list
Trina Solar1not in top list
Inverter makerEnphase5253
Tesla55
SolarEdge48
Battery makerEnphase4848
Tesla66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 160 of 161 installs, inverters on 161. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
997610Not found in the CSLB License Master file pulled Nov 4, 202699
1135059ZEO ENERGY (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 28, 2025Mar 31, 202757

License numbers are the ones the utilities recorded on the interconnection applications (159 of 161 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1135059. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles34
Tulare28
Orange15
Riverside11
Fresno10
Kings8
Ventura8
Kern7
San Bernardino6
Merced5
Contra Costa3
San Joaquin3
Santa Clara3
Santa Cruz3
Stanislaus3
Madera2
Marin2
Santa Barbara2
Alameda1
Colusa1
El Dorado1
Napa1
San Francisco1
San Luis Obispo1
Solano1
Tehama1

Top cities

CityInstalls
Tulare13
Fresno8
Hanford6
Porterville6
Palmdale5
Delano4
Lancaster4
Orange4
Bakersfield3
Buena Park3
Long Beach3
Los Angeles3
Merced3
Newman3
Orosi3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunergy Solar Inc.76
SUNERGY SOLAR LLC57
Sunergy Solar Inc10
SUNERGY SOLAR INC10
SUNERGY SOLAR INC.7
SUNERGY SOLAR1

Common questions

Where does Sunergy Solar Inc. install solar?

Its installs are spread across 26 counties. The most are in Los Angeles County (34 installs), followed by Tulare County (28).

How often does Sunergy Solar Inc. install batteries with solar?

33.5% of its interconnected solar installs include battery storage across all years, and 94.7% in the last 24 months (54 of 57).

How many Sunergy Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

57 of its 161 interconnected installs (35.4% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.