Brandt Construction

How many solar installs has Brandt Construction done in California, and which license number is on its installs?

Brandt Construction has 57 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Dec 1, 2009 to May 5, 2026), most of them in Monterey County (54) and Santa Clara County (3). CSLB lists license 687292 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
57
Last 24 months
10
Total capacity
388.6 kW DC
Median system size
6.6 kW DC
With battery storage
17.5% all time; 50.0% last 24 months
Third-party owned
0.0% of 57 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest May 5, 2026
Ownership types recorded
none recorded
Median battery size
21.3 kWh (8 installs list a capacity)
First install
Dec 1, 2009
Latest install
May 5, 2026
Counties
2
Utilities
PGE 57
CSLB license
687292

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201040
201110
201210
201300
201420
201540
201641
201730
201840
201960
202020
202130
202261
202363
202400
202541
2026 (through Aug 31, 2026)64

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 57 interconnected installs (10.5% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved May 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01729.8%not counted
NEM 2.03459.6%4 (11.8%)
Net Billing Tariff610.5%5 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Brandt Construction’s installs. No residential system in the file lists a third-party owner name that matches Brandt Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of Brandt Construction’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 70.0%) used modules recorded as REC.

In the last 24 months, 10 of Brandt Construction’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (4, 40.0%) used inverters recorded as Sol-Ark.

In the last 24 months, 3 of Brandt Construction’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Lithion Battery Inc..

3 of 10 battery-paired PG&E and SCE installs (30.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC710
Briggs & Stratton, LLC2not in top list
Mission Solar1not in top list
Qcells1not in top list
Silfab1not in top list
Inverter makerSol-Ark48
SolarEdge331
Enphase210
Tesla1not in top list
Battery makerLithion Battery Inc.22
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 57 of 57 installs, inverters on 57. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Brandt Construction as developer on 6 battery storage projects and as installer on 6 (6 name it as both), 6 projects in all with 245 kWh of storage. 1 have the status Paid, with $44,004 in current incentive allocations. Applications were received from Jun 22, 2017 to May 16, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid144$44,004
Cancelled5201$35,120

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage469$13,9100$0
Equity Resiliency144$44,0041$44,004
Large-Scale Storage1132$21,2100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
687292Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorApr 12, 1994Apr 30, 202850

License numbers are the ones the utilities recorded on the interconnection applications (50 of 57 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 687292. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Monterey54
Santa Clara3

Top cities

CityInstalls
Salinas22
Carmel11
Carmel Valley5
Monterey5
Seaside3
Pebble Beach2
Aromas1
Bradley1
Campbell1
Chualar1
Gilroy1
Greenfield1
Marina1
Sand City1
Saratoga1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRANDT CONSTRUCTION29
Brandt Construction28

Common questions

Where does Brandt Construction install solar?

Its installs are spread across 2 counties. The most are in Monterey County (54 installs), followed by Santa Clara County (3).

How often does Brandt Construction install batteries with solar?

17.5% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (5 of 10).

How many Brandt Construction installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 57 interconnected installs (10.5% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.