PALOMAR SOLAR LTD has 2,654 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jul 27, 2010 to Aug 20, 2026), most of them in San Diego County (2,398), Orange County (139) and Riverside County (95). CSLB lists license 945152 (PALOMAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,654
Last 24 months
145
Total capacity
19,807.6 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.6% of 2,445 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
143 installs, latest Aug 20, 2026
Ownership types recorded
PPA 3, lease 3, prepaid lease 8, other 1
First install
Jul 27, 2010
Latest install
Aug 20, 2026
Counties
5
Utilities
SDGE 2,513, SCE 141
CSLB license
945152

Is PALOMAR SOLAR LTD still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (76 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
2010100
2011110
2012260
2013530
20141000
20151560
20162330
20172060
20182750
20193000
20202410
20212410
20222840
20232600
20241350
20251020
2026 (through Aug 31, 2026)210

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

143 of its 2,654 interconnected installs (5.4% of the 2,645 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.054820.7%not counted
NEM 2.01,95473.9%0 (0.0%)
Net Billing Tariff1435.4%not recorded
Not recorded9

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 15 of PALOMAR SOLAR LTD’s installs the utility recorded a third-party ownership type: PPA 3, lease 3, prepaid lease 8, other 1. Across all installers, 11 residential systems list a third-party owner name that matches PALOMAR SOLAR LTD exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Palomar Solar11
NRG SunCap LLC3
Jimenez, David1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 133 of PALOMAR SOLAR LTD’s 145 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (64, 48.1%) used modules recorded as Qcells.

In the last 24 months, 136 of PALOMAR SOLAR LTD’s 145 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (86, 63.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells64141
Panasonic31567
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.21not in top list
REC16not in top list
UnitedRenewableEnergyCo.,Ltd.1not in top list
Inverter makerEnphase862,535
Tesla5050
SMA211

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,492 of 2,654 installs, inverters on 2,611. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PALOMAR SOLAR LTD as developer on 62 battery storage projects and as installer on 0 (0 name it as both), 62 projects in all with 1,132 kWh of storage. 52 have the status Paid, with $515,486 in current incentive allocations. Applications were received from Nov 3, 2020 to Nov 5, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid52938$515,486
Waitlist119$31,954
Cancelled8165$119,929
RRF Rejected110$1,456

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage34447$64,72329$57,617
Equity Resiliency24569$551,24921$438,425
Large-Scale Storage287$19,4452$19,445
Residential Solar and Storage Equity - AB 209119$31,9540$0
Not stated110$1,4560$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
945152PALOMAR ELECTRIC (Corporation)CLEARC-10 Electrical Contractor; C-39 Roofing ContractorApr 5, 2010Apr 30, 20282,236

License numbers are the ones the utilities recorded on the interconnection applications (2,239 of 2,654 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 945152. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PALOMAR SOLAR LTD’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County94515275826867636914215464

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego2,398
Orange139
Riverside95
San Bernardino16
Los Angeles6

Top cities

CityInstalls
San Diego673
Escondido295
El Cajon131
Poway124
Oceanside113
Chula Vista111
Vista103
Ramona81
Santee81
San Marcos80
Carlsbad79
Fallbrook75
Lakeside60
La Mesa59
Encinitas54

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PALOMAR SOLAR LTD2,547
Palomar Solar53
Palomar Solar, Ltd.39
Palomar Solar Ltd.9
Palomar Solar Ltd5
PALOMAR SOLAR LTD.1

Common questions

Where does PALOMAR SOLAR LTD install solar?

Its installs are spread across 5 counties. The most are in San Diego County (2,398 installs), followed by Orange County (139).

How often does PALOMAR SOLAR LTD install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PALOMAR SOLAR LTD installs are under NEM 3.0 (the Net Billing Tariff)?

143 of its 2,654 interconnected installs (5.4% of the 2,645 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.