SunWork Renewable Energy Projects

How many solar installs has SunWork Renewable Energy Projects done in California, and which license number is on its installs?

SunWork Renewable Energy Projects has 1,120 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Aug 28, 2009 to Jul 27, 2026), most of them in Santa Clara County (481), Alameda County (281) and San Luis Obispo County (128). CSLB lists license 920732 (SUNWORK RENEWABLE ENERGY PROJECTS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-36, C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,120
Last 24 months
154
Total capacity
5,030.3 kW DC
Median system size
4 kW DC
With battery storage
1.3% all time; 9.1% last 24 months
Third-party owned
0.4% of 1,120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
18 installs, latest Apr 20, 2026
Ownership types recorded
PPA 3, other 2
First install
Aug 28, 2009
Latest install
Jul 27, 2026
Counties
10
Utilities
PGE 1,120
CSLB license
920732

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201040
201180
2012110
2013180
2014490
2015640
2016920
2017790
2018900
20191030
2020980
2021940
2022990
2023961
2024960
2025924
2026 (through Aug 31, 2026)2610

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

18 of its 1,120 interconnected installs (1.6% of the 1,120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those include battery storage. The latest Net Billing Tariff install was approved Apr 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.027724.7%not counted
NEM 2.082573.7%4 (0.5%)
Net Billing Tariff181.6%10 (55.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of SunWork Renewable Energy Projects’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 2. Across all installers, 1 residential systems list a third-party owner name that matches SunWork Renewable Energy Projects exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
People Power Solar Collective2
Subbarao Jagannatha1
Sunwork Renewable Energy Projects1
Trisolaris-Heirloom, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of SunWork Renewable Energy Projects’ 154 installs name a module maker in the “Generator Manufacturer” fields, and most of those (50, 75.8%) used modules recorded as Qcells.

In the last 24 months, 154 of SunWork Renewable Energy Projects’ 154 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (119, 77.3%) used inverters recorded as Enphase.

In the last 24 months, 14 of SunWork Renewable Energy Projects’ 154 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 92.9%) used batteries recorded as Enphase.

13 of 15 battery-paired PG&E and SCE installs (86.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells50288
REC18491
JinkoSolar435
Canadian Solar3not in top list
Silfab3not in top list
Inverter makerEnphase119723
SMA22219
SolarEdge11109
ABB851
Fronius3not in top list
Battery makerEnphase1313
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 857 of 1,120 installs, inverters on 1,119. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
920732SUNWORK RENEWABLE ENERGY PROJECTS (Corporation)CLEARC-36; C-46 Solar ContractorAug 13, 2008Aug 31, 20281,059

License numbers are the ones the utilities recorded on the interconnection applications (1,060 of 1,120 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 920732. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SunWork Renewable Energy Projects’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202120232024Total
City and County of San Francisco920732212117

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara481
Alameda281
San Luis Obispo128
San Mateo123
Contra Costa75
Santa Cruz13
Santa Barbara9
San Francisco8
Solano1
Sonoma1

Top cities

CityInstalls
San Jose178
Sunnyvale111
Fremont78
Berkeley60
San Luis Obispo55
Oakland50
Cupertino47
Los Altos42
Redwood City30
Mountain View29
Campbell21
El Cerrito21
Milpitas20
Newark18
Cambria17

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNWORK RENEWABLE ENERGY PROJECTS652
SunWork Renewable Energy Projects362
Sunwork Renewable Energy Projects100
sunwork renewable energy projects2
Sunwork renewable energy projects2
Sunwork Renewable Energy /projects1
SunWork renewable Energy Projects1

Common questions

Where does SunWork Renewable Energy Projects install solar?

Its installs are spread across 10 counties. The most are in Santa Clara County (481 installs), followed by Alameda County (281).

How often does SunWork Renewable Energy Projects install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years, and 9.1% in the last 24 months (14 of 154).

How many SunWork Renewable Energy Projects installs are under NEM 3.0 (the Net Billing Tariff)?

18 of its 1,120 interconnected installs (1.6% of the 1,120 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.