Super Solar

How many solar installs has Super Solar done in California, and which license number is on its installs?

Super Solar has 379 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Apr 22, 2008 to Jun 11, 2026), most of them in Alameda County (336), Contra Costa County (30) and San Francisco County (6). CSLB lists license 999088 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Super Solar here carry more than one CSLB license number: 999088 on 268 (CSLB holder Sole owner license (name not shown)) and 929323 on 19 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
379
Last 24 months
33
Total capacity
1,796.5 kW DC
Median system size
4.1 kW DC
With battery storage
6.3% all time; 30.3% last 24 months
Third-party owned
0.0% of 379 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Jun 11, 2026
Ownership types recorded
none recorded
Median battery size
9.8 kWh (11 installs list a capacity)
First install
Apr 22, 2008
Latest install
Jun 11, 2026
Counties
7
Utilities
PGE 379
CSLB license
999088, 929323

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200880
2009160
2010170
2011150
2012120
2013170
2014220
2015240
2016260
2017290
2018220
2019190
2020203
2021131
2022298
2023401
2024242
2025185
2026 (through Aug 31, 2026)84

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 379 interconnected installs (3.2% of the 379 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Jun 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.015841.7%not counted
NEM 2.020955.1%13 (6.2%)
Net Billing Tariff123.2%10 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Super Solar’s installs. No residential system in the file lists a third-party owner name that matches Super Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 30 of Super Solar’s 33 installs name a module maker in the “Generator Manufacturer” fields, and most of those (20, 66.7%) used modules recorded as Qcells.

In the last 24 months, 33 of Super Solar’s 33 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 81.8%) used inverters recorded as Enphase.

In the last 24 months, 10 of Super Solar’s 33 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 100.0%) used batteries recorded as Enphase.

20 of 24 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells20154
Trina Solar821
Canadian Solar150
JA Solar1not in top list
Inverter makerEnphase27183
SolarEdge481
SMA393
Battery makerEnphase1011

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 356 of 379 installs, inverters on 379. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Super Solar as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Sep 29, 2020 to Sep 29, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$16,502

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency117$16,5020$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
999088Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorDec 9, 2014Dec 31, 2026268
929323Not found in the CSLB License Master file pulled Nov 4, 202619

License numbers are the ones the utilities recorded on the interconnection applications (287 of 379 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 999088. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Super Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco999088011
unincorporated Marin County999088101

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Alameda336
Contra Costa30
San Francisco6
Santa Clara3
Marin2
Napa1
San Mateo1

Top cities

CityInstalls
Oakland183
Berkeley111
Piedmont19
Albany6
Orinda6
San Francisco6
Lafayette5
Moraga5
Richmond5
Castro Valley4
El Cerrito3
Kensington3
San Leandro3
Emeryville2
Fremont2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUPER SOLAR187
Super Solar151
super solar41

Common questions

Where does Super Solar install solar?

Its installs are spread across 7 counties. The most are in Alameda County (336 installs), followed by Contra Costa County (30).

How often does Super Solar install batteries with solar?

6.3% of its interconnected solar installs include battery storage across all years, and 30.3% in the last 24 months (10 of 33).

How many Super Solar installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 379 interconnected installs (3.2% of the 379 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.