How many solar permits did the City of Corona issue in 2025?

How many solar permits did the City of Corona issue in 2025?

The City of Corona issued 921 residential solar permits in 2025 and 357 permits matching the battery filter, according to its open data: CorStat - Building Permits, corstat.coronaca.gov dataset 2agx-camz. In the same year, the investor-owned utilities interconnected 1,121 residential solar systems with the service city Corona, according to California DG Stats. The two counts measure different steps and different areas, so they are not expected to match.

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Solar permits issued in the City of Corona

From The City of Corona’s open data: CorStat - Building Permits, corstat.coronaca.gov dataset 2agx-camz. Counted by calendar year of the issued field. Solar: permittype = 'ELECTRICAL RESIDENTIAL' with permitsubtype 'SOLAR PANELS-PHOTOVOLTAIC SYSTEM', 'SOLAR PV WITH ESS' or 'PHOTOVOLTAIC SYSTEM', or permittype = 'SYMBIUM SOLAR' (the city’s automated solar permit). Battery: those solar permits with permitsubtype 'SOLAR PV WITH ESS' or 'WITH ESS', or a description that mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Oct 15, 2026. Checked Nov 16, 2026.

YearSolar permitsBattery permits
20187261
20197758
202082210
20211,07736
20221,65224
20231,71126
2024882213
2025921357
2026 (through Nov 16, 2026)344197

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. A permit is counted in the year of its issued date. Permits later withdrawn or expired are counted if they carry an issue date. The dataset names no contractor or license number, so permits are not linked to installers.

Corona solar permits and interconnections by year

YearCity solar permits issuedSolar systems interconnected (DG Stats, service city Corona)
20221,6521,907
20231,7112,415
20248821,398
20259211,121
2026 (permits through Nov 16, 2026, installs through Aug 31, 2026)344674

Permits are counted by issue date and interconnections by utility approval date, which often falls weeks or months later. The DG Stats service city is the city the utility recorded for the address, which can include homes outside city limits with a Corona mailing address. Battery permits count solar permits with storage; the DG Stats battery figure counts utility solar records that include storage.

Installers ranked by interconnected installs in Corona, Sep 2024 through Aug 2026

1Sunrun6771,897
2Tesla Energy Operations (formerly SolarCity)1702,367
3SunPower1681,909
4BRIGHT OPS123164
5FREEDOM FOREVER LLC72449
6V3 Electric49189
7Empower Electric Solar4659
8SUNNOVA ENERGY CORPORATION35188
9SolarMax Renewable Energy Provider, Inc31428
10ORANGE COUNTY CONTRACTING SERVICES3063
11Complete Solar29121
12Current Home25154
13BETTER EARTH ELECTRIC INC24140
14ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING24229
15LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC2334
16FREEDOM FOREVER SOUTHERN CALIFORNIA LLC2121
17LUXOR ENERGY INC2132
18Powur PBC (Powur Home)21100
19TIMEPROOFUSA2121
20MY SMART HOUSE LLC1717
21Solar Optimum Inc.1798
22SKYLINE SMART ENERGY1524
23AXIA SOLAR CORP1313
24EXO Energy1353
25Semper Solaris Construction Inc13241

These rankings count systems the utilities connected. They do not measure price, workmanship, reviews or customer service. The city’s permit data names no contractor, so permits cannot be counted per installer.

Full Corona page, and the Riverside County page.

Common questions

How many solar permits with a battery did Corona issue in 2025?

357 of the 921 residential solar permits issued in 2025 match the battery filter: permit subtype “SOLAR PV WITH ESS” or “WITH ESS”, or a description that mentions a battery, energy storage or a Powerwall.

Why do the permit and interconnection counts differ?

A permit is issued before work starts and an interconnection is approved after the system is built and inspected, so the two fall in different months and sometimes different years. Some permits are never built, and the utility’s service city can include addresses outside city limits.

Does Corona publish who pulled each solar permit?

Not in this dataset. CorStat - Building Permits (2agx-camz) has no contractor or license number field, so this index does not link Corona permits to installers.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.