VOLT MODERN ROOFING
How many solar installs has VOLT MODERN ROOFING done in California, and which license number is on its installs?
VOLT MODERN ROOFING has 185 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jul 15, 2020 to Mar 26, 2026), most of them in Placer County (68), Sutter County (23) and Butte County (17). CSLB lists license 1042043 (VOLT MODERN ROOFING AND SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-39, C-46, expires Jul 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 185
- Last 24 months
- 2
- Total capacity
- 1,462.2 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 4.9% all time; 0.0% last 24 months
- Third-party owned
- 0.5% of 185 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 8 installs, latest Jul 3, 2024
- Ownership types recorded
- lease 1
- First install
- Jul 15, 2020
- Latest install
- Mar 26, 2026
- Counties
- 18
- Utilities
- PGE 185
- CSLB license
- 1042043
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2020 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2020 | 10 | 0 |
| 2021 | 44 | 1 |
| 2022 | 61 | 4 |
| 2023 | 62 | 0 |
| 2024 | 6 | 4 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 2 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
8 of its 185 interconnected installs (4.3% of the 185 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 3, 2024.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1 | 0.5% | not counted |
| NEM 2.0 | 176 | 95.1% | 5 (2.8%) |
| Net Billing Tariff | 8 | 4.3% | 4 (50.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of VOLT MODERN ROOFING’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches VOLT MODERN ROOFING exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SUNPOWER | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 2 of VOLT MODERN ROOFING’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.
In the last 24 months, 2 of VOLT MODERN ROOFING’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.
In the last 24 months, none of VOLT MODERN ROOFING’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 2 | 57 |
| Inverter maker | Enphase | 2 | 162 |
| Battery maker | SunPower | 0 | 5 |
| Enphase | 0 | 4 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 168 of 185 installs, inverters on 185. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1042043 | VOLT MODERN ROOFING AND SOLAR (Corporation) | CLEAR | C-39 Roofing Contractor; C-46 Solar Contractor | Jul 19, 2018 | Jul 31, 2028 | 185 |
License numbers are the ones the utilities recorded on the interconnection applications (185 of 185 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1042043. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- VOLT MODERN ROOFING AND SOLAR: 37 installs, license 1042043
Counties
| County | Installs |
|---|---|
| Placer | 68 |
| Sutter | 23 |
| Butte | 17 |
| El Dorado | 17 |
| Yolo | 12 |
| Yuba | 11 |
| Nevada | 9 |
| Solano | 7 |
| Amador | 5 |
| San Joaquin | 4 |
| Calaveras | 3 |
| Contra Costa | 2 |
| Sonoma | 2 |
| Alameda | 1 |
| Colusa | 1 |
| Napa | 1 |
| Plumas | 1 |
| Santa Clara | 1 |
Top cities
| City | Installs |
|---|---|
| Rocklin | 26 |
| Yuba City | 19 |
| Lincoln | 16 |
| Auburn | 13 |
| Chico | 13 |
| Davis | 9 |
| El Dorado Hills | 8 |
| Granite Bay | 7 |
| Marysville | 5 |
| Cameron Park | 4 |
| Colfax | 3 |
| Penn Valley | 3 |
| Stockton | 3 |
| Vacaville | 3 |
| Valley Springs | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| VOLT MODERN ROOFING | 185 |
Common questions
Where does VOLT MODERN ROOFING install solar?
Its installs are spread across 18 counties. The most are in Placer County (68 installs), followed by Sutter County (23).
How often does VOLT MODERN ROOFING install batteries with solar?
4.9% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).
How many VOLT MODERN ROOFING installs are under NEM 3.0 (the Net Billing Tariff)?
8 of its 185 interconnected installs (4.3% of the 185 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.