UPSCALE CONSTRUCTION

How many solar installs has UPSCALE CONSTRUCTION done in California, and which license number is on its installs?

UPSCALE CONSTRUCTION has 156 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Nov 29, 2021 to Aug 31, 2026), most of them in Merced County (29), Fresno County (21) and San Joaquin County (18). CSLB lists license 1076489 (UPSCALE CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
156
Last 24 months
66
Total capacity
1,388.3 kW DC
Median system size
7.9 kW DC
With battery storage
50.0% all time; 97.0% last 24 months
Third-party owned
39.1% of 156 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
77 installs, latest Aug 31, 2026
Ownership types recorded
PPA 59, lease 1, other 1
Median battery size
18 kWh (25 installs list a capacity)
First install
Nov 29, 2021
Latest install
Aug 31, 2026
Counties
25
Utilities
PGE 131, SCE 25
CSLB license
1076489

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202130
2022100
2023657
20242318
20252624
2026 (through Aug 31, 2026)2929

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

77 of its 156 interconnected installs (49.4% of the 156 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07950.6%1 (1.3%)
Net Billing Tariff7749.4%77 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 61 of UPSCALE CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 59, lease 1, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches UPSCALE CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Goodleap17
Solwerks Power15
EVERBRIGHT LLC12
Solwerks7
SOLWERKS POWER PPA5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of UPSCALE CONSTRUCTION’s 66 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (32, 48.5%) used modules recorded as Qcells.

In the last 24 months, 66 of UPSCALE CONSTRUCTION’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 63.6%) used inverters recorded as Enphase.

In the last 24 months, 53 of UPSCALE CONSTRUCTION’s 66 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (39, 73.6%) used batteries recorded as Enphase.

64 of 78 battery-paired PG&E and SCE installs (82.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3272
JA Solar1819
Znshine1121
Canadian Solar3not in top list
Elin Energy2not in top list
Inverter makerEnphase42102
Tesla1212
Qcells1010
SolarEdge638
FranklinWH12
Battery makerEnphase3950
Tesla1111
Shenzhen Eternalplanet Energy Pingshan Ltd.22
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 149 of 156 installs, inverters on 156. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076489UPSCALE CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 3, 2021Jun 30, 2027156

License numbers are the ones the utilities recorded on the interconnection applications (156 of 156 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1076489. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Merced29
Fresno21
San Joaquin18
Stanislaus18
Los Angeles12
Riverside10
Santa Clara8
Contra Costa6
Madera5
Alameda4
Monterey4
Placer3
San Bernardino3
Yuba3
Shasta2
Butte1
Humboldt1
Kings1
Marin1
Mariposa1
Nevada1
San Luis Obispo1
San Mateo1
Santa Cruz1
Tulare1

Top cities

CityInstalls
Fresno15
Newman9
Atwater8
Stockton8
Manteca7
Palmdale7
Los Banos6
Merced6
Oakdale6
San Jose6
Gustine5
Moreno Valley5
Littlerock4
Madera4
Richmond3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UPSCALE CONSTRUCTION156

Common questions

Where does UPSCALE CONSTRUCTION install solar?

Its installs are spread across 25 counties. The most are in Merced County (29 installs), followed by Fresno County (21).

How often does UPSCALE CONSTRUCTION install batteries with solar?

50.0% of its interconnected solar installs include battery storage across all years, and 97.0% in the last 24 months (64 of 66).

How many UPSCALE CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

77 of its 156 interconnected installs (49.4% of the 156 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.