SolarCo Inc

How many solar installs has SolarCo Inc done in California, and which license number is on its installs?

SolarCo Inc has 427 residential solar installs interconnected in California, active in the records from 2014 through 2019 (Sep 23, 2014 to Jul 28, 2019), most of them in Solano County (123), Yolo County (100) and Placer County (70). The license number recorded on most of its installs, 935260, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
427
Last 24 months
0
Total capacity
2,118.8 kW DC
Median system size
4.7 kW DC
With battery storage
2.6% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 414 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10 kWh (11 installs list a capacity)
First install
Sep 23, 2014
Latest install
Jul 28, 2019
Counties
14
Utilities
PGE 411, SCE 16
CSLB license
935260

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014410
2015790
201630
20171610
20181100
20193311
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 427 interconnected installs with a tariff recorded (427) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013230.9%not counted
NEM 2.029569.1%11 (3.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarCo Inc’s installs. No residential system in the file lists a third-party owner name that matches SolarCo Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 402 of SolarCo Inc’s 427 installs name a module maker in the “Generator Manufacturer” fields, and most of those (263, 65.4%) used modules recorded as Hyundai.

Across all years, 427 of SolarCo Inc’s 427 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (321, 75.2%) used inverters recorded as Enphase.

Across all years, 2 of SolarCo Inc’s 427 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 11 battery-paired PG&E and SCE installs (18.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai0263
Yingli098
SolarWorld024
LG010
Sanyo05
Inverter makerEnphase0321
SolarEdge0106
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 402 of 427 installs, inverters on 427. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SolarCo Inc as developer on 34 battery storage projects and as installer on 35 (34 name it as both), 35 projects in all with 303 kWh of storage. 34 have the status Paid, with $85,494 in current incentive allocations. Applications were received from Jan 7, 2019 to Sep 16, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid34294$85,494
Cancelled18$2,099

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage35303$87,59234$85,494

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
935260Not found in the CSLB License Master file pulled Nov 4, 2026408

License numbers are the ones the utilities recorded on the interconnection applications (412 of 427 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Solano123
Yolo100
Placer70
San Joaquin45
Sutter33
Yuba23
San Bernardino8
Riverside7
El Dorado6
Amador5
Colusa3
Napa2
Los Angeles1
Santa Clara1

Top cities

CityInstalls
Vacaville68
Woodland47
West Sacramento39
Rocklin38
Yuba City32
Fairfield28
Lincoln23
Manteca18
Dixon16
Plumas Lake12
Stockton12
Davis11
Rio Vista9
Tracy9
Marysville8

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarCo Inc255
Solarco, Inc.86
SOLARCO32
SOLARCO, INC22
Solarco, Inc15
SolarCo, Inc5
SolarCo, Inc.4
Solarco3
SolarCo1
SolarCo Inc.1
Solarco, inc1
Solarco, inc.1
Solarco,Inc1

Common questions

Where does SolarCo Inc install solar?

Its installs are spread across 14 counties. The most are in Solano County (123 installs), followed by Yolo County (100).

How often does SolarCo Inc install batteries with solar?

2.6% of its interconnected solar installs include battery storage across all years.

How many SolarCo Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 427 interconnected installs with a tariff recorded (427) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.