SolarCo Solutions

How many solar installs has SolarCo Solutions done in California, and which license number is on its installs?

SolarCo Solutions has 281 residential solar installs interconnected in California, active in the records from 2015 through 2019 (Jul 10, 2015 to Jul 30, 2019), most of them in Yolo County (77), Solano County (75) and Placer County (71). The license number recorded on most of its installs, 935260, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
281
Last 24 months
0
Total capacity
1,422.3 kW DC
Median system size
4.9 kW DC
With battery storage
0.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 281 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10 kWh (2 installs list a capacity)
First install
Jul 10, 2015
Latest install
Jul 30, 2019
Counties
10
Utilities
PGE 281
CSLB license
935260

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015700
20161820
2017230
201810
201952
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 281 interconnected installs with a tariff recorded (281) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025289.7%not counted
NEM 2.02910.3%2 (6.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarCo Solutions’s installs. No residential system in the file lists a third-party owner name that matches SolarCo Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 277 of SolarCo Solutions’ 281 installs name a module maker in the “Generator Manufacturer” fields, and most of those (208, 75.1%) used modules recorded as Hyundai.

Across all years, 281 of SolarCo Solutions’ 281 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (276, 98.2%) used inverters recorded as Enphase.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai0208
Yingli057
SolarWorld07
LG03
Sanyo02
Inverter makerEnphase0276
SolarEdge05
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 277 of 281 installs, inverters on 281. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
935260Not found in the CSLB License Master file pulled Nov 4, 2026280

License numbers are the ones the utilities recorded on the interconnection applications (281 of 281 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Yolo77
Solano75
Placer71
Sutter32
San Joaquin12
El Dorado5
Yuba5
Contra Costa2
Colusa1
Nevada1

Top cities

CityInstalls
Vacaville47
Woodland36
Yuba City32
Lincoln30
Rocklin30
Fairfield22
West Sacramento21
Davis18
Auburn6
Dixon4
Granite Bay4
El Dorado Hills3
Manteca3
Cameron Park2
Lodi2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarCo Solutions276
SOLARCO SOLUTIONS5

Common questions

Where does SolarCo Solutions install solar?

Its installs are spread across 10 counties. The most are in Yolo County (77 installs), followed by Solano County (75).

How often does SolarCo Solutions install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years.

How many SolarCo Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 281 interconnected installs with a tariff recorded (281) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.