Responsible Solar

How many solar installs has Responsible Solar done in California, and which license number is on its installs?

Responsible Solar has 333 residential solar installs interconnected in California, active in the records from 2012 through 2022 (Aug 28, 2012 to Jan 6, 2022), most of them in Riverside County (92), Tehama County (83) and Shasta County (81). The license number recorded on most of its installs, 974916, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
333
Last 24 months
0
Total capacity
2,603 kW DC
Median system size
7.3 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
5.0% of 303 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 9, lease 5, other 1
First install
Aug 28, 2012
Latest install
Jan 6, 2022
Counties
22
Utilities
PGE 203, SCE 115, SDGE 15
CSLB license
974916

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
2013330
2014290
2015330
2016351
2017460
2018480
2019540
2020310
2021220
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 333 interconnected installs with a tariff recorded (333) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013540.5%not counted
NEM 2.019859.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 15 of Responsible Solar’s installs the utility recorded a third-party ownership type: PPA 9, lease 5, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Responsible Solar exactly.

Third-party owner named on its installsInstalls
Kilowatt Systems, LLC11
Raydius Energy, LLC2
Harker, Susan1
Sunrun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 268 of Responsible Solar’s 333 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (118, 44.0%) used modules recorded as Canadian Solar.

Across all years, 333 of Responsible Solar’s 333 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (128, 38.4%) used inverters recorded as SolarEdge.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0118
Trina Solar038
Qcells031
SolarWorld023
Mission Solar016
Inverter makerSolarEdge0128
Enphase077
SMA077
Fronius042
ABB03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 268 of 333 installs, inverters on 333. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Responsible Solar as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 7, 2020 to Oct 7, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled18$8,394

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency18$8,3940$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974916Not found in the CSLB License Master file pulled Nov 4, 2026315

License numbers are the ones the utilities recorded on the interconnection applications (317 of 333 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Responsible Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
unincorporated San Diego County97491611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside92
Tehama83
Shasta81
San Diego13
Butte12
San Bernardino12
Lake10
Orange9
Mendocino5
Los Angeles3
Placer2
Colusa1
Contra Costa1
Glenn1
Humboldt1
Napa1
Nevada1
Solano1
Sutter1
Ventura1
Yolo1
Yuba1

Top cities

CityInstalls
Red Bluff48
Redding31
Hemet28
San Jacinto23
Anderson21
Cottonwood19
Corning12
Chico7
Corona5
Gerber5
Moreno Valley5
Fallbrook4
Perris4
Redlands4
San Diego4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Responsible Solar164
RESPONSIBLE SOLAR89
Responsible Solar Inc38
RESPONSIBLE SOLAR INC38
Responsible Solar, Inc3
Responsible Solar Inc.1

Common questions

Where does Responsible Solar install solar?

Its installs are spread across 22 counties. The most are in Riverside County (92 installs), followed by Tehama County (83).

How often does Responsible Solar install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Responsible Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 333 interconnected installs with a tariff recorded (333) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.