RAKKAR DEVELOPMENT & CONSTRUCTION

How many solar installs has RAKKAR DEVELOPMENT & CONSTRUCTION done in California, and which license number is on its installs?

RAKKAR DEVELOPMENT & CONSTRUCTION has 251 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Feb 13, 2019 to Jun 9, 2026), most of them in Fresno County (88), Tulare County (27) and Santa Clara County (21). CSLB lists license 1037594 (RAKKAR DEVELOPMENT & CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
251
Last 24 months
37
Total capacity
2,286.2 kW DC
Median system size
7.3 kW DC
With battery storage
15.9% all time; 67.6% last 24 months
Third-party owned
3.2% of 251 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
46 installs, latest May 30, 2025
Ownership types recorded
PPA 8
Median battery size
10 kWh (15 installs list a capacity)
First install
Feb 13, 2019
Latest install
Jun 9, 2026
Counties
20
Utilities
PGE 223, SCE 28
CSLB license
1037594

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019130
2020330
2021290
2022472
2023560
20245430
2025168
2026 (through Aug 31, 2026)30

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

46 of its 251 interconnected installs (18.3% of the 251 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.6% of those include battery storage. The latest Net Billing Tariff install was approved May 30, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.8%not counted
NEM 2.020380.9%2 (1.0%)
Net Billing Tariff4618.3%38 (82.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 8 of RAKKAR DEVELOPMENT & CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 8, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches RAKKAR DEVELOPMENT & CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Everbright8

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of RAKKAR DEVELOPMENT & CONSTRUCTION’s 37 installs name a module maker in the “Generator Manufacturer” fields, and most of those (21, 60.0%) used modules recorded as Qcells.

In the last 24 months, 37 of RAKKAR DEVELOPMENT & CONSTRUCTION’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 91.9%) used inverters recorded as Enphase.

In the last 24 months, 24 of RAKKAR DEVELOPMENT & CONSTRUCTION’s 37 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (24, 100.0%) used batteries recorded as Enphase.

38 of 40 battery-paired PG&E and SCE installs (95.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells21150
LONGi811
Phono Solar Technology632
Canadian Solar119
REC1not in top list
Inverter makerEnphase34179
SolarEdge568
Power-One13
SMA1not in top list
Battery makerEnphase2438

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 237 of 251 installs, inverters on 251. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1037594RAKKAR DEVELOPMENT & CONSTRUCTION (Corporation)CLEARB General Building ContractorMar 30, 2018Mar 31, 2028251

License numbers are the ones the utilities recorded on the interconnection applications (251 of 251 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1037594. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno88
Tulare27
Santa Clara21
Sutter20
Kern16
Merced16
Madera12
Alameda11
Contra Costa10
Placer10
San Joaquin8
Kings3
Yolo2
Butte1
Calaveras1
Marin1
Mariposa1
Monterey1
Orange1
Solano1

Top cities

CityInstalls
Fresno51
Yuba City18
San Jose16
Bakersfield15
Kerman14
Madera11
Porterville8
Clovis7
Granite Bay6
Tulare6
Coalinga5
Fremont5
Los Banos5
Visalia5
Dublin4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RAKKAR DEVELOPMENT & CONSTRUCTION246
Rakkar Development & Construction3
rakkar development and construction2

Common questions

Where does RAKKAR DEVELOPMENT & CONSTRUCTION install solar?

Its installs are spread across 20 counties. The most are in Fresno County (88 installs), followed by Tulare County (27).

How often does RAKKAR DEVELOPMENT & CONSTRUCTION install batteries with solar?

15.9% of its interconnected solar installs include battery storage across all years, and 67.6% in the last 24 months (25 of 37).

How many RAKKAR DEVELOPMENT & CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

46 of its 251 interconnected installs (18.3% of the 251 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.