Power Independence Electric

How many solar installs has Power Independence Electric done in California, and which license number is on its installs?

Power Independence Electric has 202 residential solar installs interconnected in California, active in the records from 2002 through 2015 (Apr 23, 2002 to Aug 5, 2015), most of them in Contra Costa County (41), San Joaquin County (41) and Fresno County (26). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
202
Last 24 months
0
Total capacity
1,114.2 kW DC
Median system size
5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 192 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 23, 2002
Latest install
Aug 5, 2015
Counties
27
Utilities
PGE 192, SCE 10
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200250
2003140
2004510
2005270
2006550
2007450
200830
200900
201000
201110
201200
201300
201400
201510
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 202 interconnected installs with a tariff recorded (202) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0202100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Power Independence Electric’s installs. No residential system in the file lists a third-party owner name that matches Power Independence Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 186 of Power Independence Electric’s 202 installs name a module maker in the “Generator Manufacturer” fields, and most of those (178, 95.7%) used modules recorded as BP Solar.

Across all years, 202 of Power Independence Electric’s 202 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (156, 77.2%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBP Solar0178
Sharp05
Connect Renewable Energy01
Kyocera01
Shott Applied Power Corp.01
Inverter makerSMA0156
Xantrex Technology Inc.031
PV Powered018
Sharp02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 186 of 202 installs, inverters on 202. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (1 of 202 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Contra Costa41
San Joaquin41
Fresno26
Calaveras17
Alameda12
Tulare11
Madera8
Stanislaus6
Amador5
Merced5
Tehama4
Tuolumne4
San Mateo3
Yolo3
El Dorado2
Placer2
Santa Clara2
Butte1
Kings1
Mariposa1
Napa1
Sacramento1
San Benito1
San Francisco1
Shasta1
Sonoma1
Sutter1

Top cities

CityInstalls
Stockton13
Tracy11
Brentwood10
Madera8
Manteca8
Antioch7
Clovis7
Fresno7
Oakdale6
Visalia6
Reedley4
Valley Springs4
Wallace4
Walnut Creek4
Burson3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Power Independence Electric183
POWER INDEPENDENCE ELECTRIC15
Power Independence Electric, Inc.2
POwer Independence Electric1
POWER INDEPENDENCE ELECTRIC, INC.1

Common questions

Where does Power Independence Electric install solar?

Its installs are spread across 27 counties. The most are in Contra Costa County (41 installs), followed by San Joaquin County (41).

How often does Power Independence Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Power Independence Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 202 interconnected installs with a tariff recorded (202) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.