ON POINT ELECTRIC

How many solar installs has ON POINT ELECTRIC done in California, and which license number is on its installs?

ON POINT ELECTRIC has 43 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Aug 5, 2019 to Aug 27, 2026), most of them in Contra Costa County (10), Fresno County (6) and Solano County (5). CSLB lists license 1067169 (ON POINT ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
41
Total capacity
295.9 kW DC
Median system size
6.5 kW DC
With battery storage
93.0% all time; 95.1% last 24 months
Third-party owned
2.3% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
39 installs, latest May 13, 2026
Ownership types recorded
PPA 1
Median battery size
13.5 kWh (21 installs list a capacity)
First install
Aug 5, 2019
Latest install
Aug 27, 2026
Counties
18
Utilities
PGE 39, SCE 4
CSLB license
1067169

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202000
202100
202200
202300
202422
20253230
2026 (through Aug 31, 2026)88

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

39 of its 43 interconnected installs (90.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.9% of those include battery storage. The latest Net Billing Tariff install was approved May 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.037.0%not counted
NEM 2.012.3%0 (0.0%)
Net Billing Tariff3990.7%37 (94.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of ON POINT ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ON POINT ELECTRIC exactly.

Third-party owner named on its installsInstalls
Goodleap PPA1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 37 of ON POINT ELECTRIC’s 41 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 75.7%) used modules recorded as Qcells.

In the last 24 months, 41 of ON POINT ELECTRIC’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 51.2%) used inverters recorded as Tesla.

In the last 24 months, 36 of ON POINT ELECTRIC’s 41 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (18, 50.0%) used batteries recorded as Tesla.

37 of 40 battery-paired PG&E and SCE installs (92.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2828
CertainTeed33
LONGi22
Canadian Solar11
JA Solar1not in top list
Inverter makerTesla2121
Enphase2021
SMA22
ABB11
FranklinWH11
Battery makerTesla1818
Enphase1718
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1067169ON POINT ELECTRIC (Corporation)CLEAR, Pending Case/CITC-10 Electrical ContractorJul 22, 2020Sep 30, 202742

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1067169. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa10
Fresno6
Solano5
Santa Clara4
Alameda3
El Dorado2
Orange2
Kings1
Lake1
Los Angeles1
Madera1
Mariposa1
Merced1
Monterey1
Placer1
San Luis Obispo1
San Mateo1
Yolo1

Top cities

CityInstalls
Concord4
Fresno3
Richmond3
San Jose3
Vacaville3
Clovis2
El Dorado Hills2
Vallejo2
Berkeley1
Clayton1
Danville1
Downey1
Gustine1
Half Moon Bay1
Hanford1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ON POINT ELECTRIC42
On Point Electric1

Common questions

Where does ON POINT ELECTRIC install solar?

Its installs are spread across 18 counties. The most are in Contra Costa County (10 installs), followed by Fresno County (6).

How often does ON POINT ELECTRIC install batteries with solar?

93.0% of its interconnected solar installs include battery storage across all years, and 95.1% in the last 24 months (39 of 41).

How many ON POINT ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

39 of its 43 interconnected installs (90.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.