Fralick Homes

How many solar installs has Fralick Homes done in California, and which license number is on its installs?

Fralick Homes has 792 residential solar installs interconnected in California, active in the records from 2011 through 2016 (Sep 29, 2011 to Jan 19, 2016), most of them in Placer County (243), Yolo County (90) and El Dorado County (89). CSLB lists license 949707 (HOOKED ON SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
792
Last 24 months
0
Total capacity
5,753.5 kW DC
Median system size
6.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
11.9% of 792 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 94
First install
Sep 29, 2011
Latest install
Jan 19, 2016
Counties
26
Utilities
PGE 779, SCE 13
CSLB license
949707

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201150
2012980
20131330
20141890
20153650
201620
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 792 interconnected installs with a tariff recorded (792) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0792100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 94 of Fralick Homes’s installs the utility recorded a third-party ownership type: PPA 0, lease 94, prepaid lease 0, other 0. Across all installers, 5 residential systems list a third-party owner name that matches Fralick Homes exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Hooked On Solar83
Fralick Homes5
Sunpower Capital, LLC.4
Sunpower2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 776 of Fralick Homes’ 792 installs name a module maker in the “Generator Manufacturer” fields, and most of those (749, 96.5%) used modules recorded as SunPower.

Across all years, 792 of Fralick Homes’ 792 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (377, 47.6%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0749
Qcells014
SunEdison07
SolarWorld05
Canadian Solar02
Inverter makerSMA0377
SunPower0275
Power-One063
SolarEdge053
Fronius024

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 776 of 792 installs, inverters on 792. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
949707HOOKED ON SOLAR INC (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJul 8, 2010Jun 30, 2027510

License numbers are the ones the utilities recorded on the interconnection applications (510 of 792 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 949707. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Fralick Homes’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021Total
unincorporated Marin County949707224

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Placer243
Yolo90
El Dorado89
Contra Costa76
San Joaquin55
Solano55
Alameda32
Sutter27
Nevada25
Butte15
Yuba14
Napa12
Tulare12
Santa Clara11
Lake8
Amador6
Calaveras6
Stanislaus4
San Mateo3
Glenn2
Tehama2
Kings1
Marin1
Merced1
Sonoma1
Tuolumne1

Top cities

CityInstalls
Lincoln75
Auburn63
Rocklin49
Woodland46
El Dorado Hills44
Vacaville29
Granite Bay24
Yuba City22
Stockton20
Grass Valley19
Davis18
Pleasanton14
West Sacramento14
Fairfield13
Brentwood11

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Fralick Homes665
FRALICK HOMES125
Fralick HOmes2

Common questions

Where does Fralick Homes install solar?

Its installs are spread across 26 counties. The most are in Placer County (243 installs), followed by Yolo County (90).

How often does Fralick Homes install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Fralick Homes installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 792 interconnected installs with a tariff recorded (792) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.